Back to kitchen remodel contractors
Natal Modica Construction Inc.
- Based in
- Novato
- On San Francisco permits
- Oct 2010 to Jan 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 52 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2013 | Completed final sign-off Oct 2013 | 871 27th St | replace all windows, exterior doors and skylights. add new siding on faces. add bathroom and storage area on 1st floor. remodel 2 baths, kitchen at 2nd floor. remove non load bearing wall at 2nd fl. add light monitor and reroof.Details
replace all windows, exterior doors and skylights. add new siding on faces. add bathroom and storage area on 1st floor. remodel 2 baths, kitchen at 2nd floor. remove non load bearing wall at 2nd fl. add light monitor and reroof. | $85,000 |
| Oct 13, 2010 | Completed final sign-off Oct 2011 | 2 Hill Point Av | remodel single family-remove kitchen on upper level, remodel kitchen on grd flr, convert/relocate (e) bathrms to 1 powder rm on grd flr. 1 master bathrm on 2nd flr. re-configure 2nd flr to include 2 bedrms, 1 master bedrm/1 master bathrm & 1 bathrm. remodel/legalize (e) fam rm, bath, clo in basementDetails
remodel single family-remove kitchen on upper level, remodel kitchen on grd flr, convert/relocate (e) bathrms to 1 powder rm on grd flr. 1 master bathrm on 2nd flr. re-configure 2nd flr to include 2 bedrms, 1 master bedrm/1 master bathrm & 1 bathrm. remodel/legalize (e) fam rm, bath, clo in basement | $100,000 |