Back to bathroom remodel contractors
Nash's Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Aug 2019
- Last 24 months
- 0 permits filed
17 permits since 2000: 17 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 84 Lippard Av | phase 1: install hydronic heat, remodel bedroom, study, and master bath, new patio door in e ground floor location. insulate. phase 2: remodel kitchen and guest bath at 2nd floor. voluntary shoring. pour new slabDetails
phase 1: install hydronic heat, remodel bedroom, study, and master bath, new patio door in e ground floor location. insulate. phase 2: remodel kitchen and guest bath at 2nd floor. voluntary shoring. pour new slab | $72,000 |
| Jan 25, 2013 | Completed final sign-off Apr 2013 | 556 Columbus Av | upgrade fixtures in existing bathroom wihtout moving location, install new tile, kitchen work - hang cabinets, sheetrock & tile.Details
upgrade fixtures in existing bathroom wihtout moving location, install new tile, kitchen work - hang cabinets, sheetrock & tile. | $2,000 |
| May 22, 2012 | Completed final sign-off Jul 2012 | 301 Coleridge St | bthroom and kitchen remodel: replacing fixtures and cabinetry in kind, new floors, updated to code wiring, repair walls & tiles in bathroom, new vanity, shower, toilet, new bathroom light/vent. no structural work. no change on walls and openings.Details
bthroom and kitchen remodel: replacing fixtures and cabinetry in kind, new floors, updated to code wiring, repair walls & tiles in bathroom, new vanity, shower, toilet, new bathroom light/vent. no structural work. no change on walls and openings. | $15,900 |
| Mar 8, 2012 | Completed final sign-off Apr 2012 | 615 Randolph St | refinish bathroom @ 2nd floor - replace tub w/shower , one new lighting, waterproof light in shower, no structural work.Details
refinish bathroom @ 2nd floor - replace tub w/shower , one new lighting, waterproof light in shower, no structural work. | $6,500 |
| Sep 19, 2011 | Completed final sign-off Dec 2011 | 1012 Shrader St | remodel extg 2nd floor kitchen, powder room and family room. remodel extg 3rd floor rear bedroom area into master suite with bedroom, bathroom, closet and study. replace exg windows and doors at rear with new.Details
remodel extg 2nd floor kitchen, powder room and family room. remodel extg 3rd floor rear bedroom area into master suite with bedroom, bathroom, closet and study. replace exg windows and doors at rear with new. | $45,000 |