Back to bathroom remodel contractors
Mz Construction Company
- Based in
- Daly City
- On San Francisco permits
- Jun 2008 to Jul 2026
- Last 24 months
- 21 permits filed
173 permits since 2000: 123 completed, 14 in progress, 29 never finaled, 7 expired or cancelled.
Of the 29 never-finaled permits, 11 are 5 to 10 years old, 18 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
101 bathroom remodel permits: 70 completed, 10 in progress, 16 never finaled, 5 expired or cancelled. Typically 2 days from filing to permit and 173 days from permit to final inspection.
Showing the 100 most recent of 101.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Aug 2026 | 18 Talbert St | 1st floor: remodel existing floor space to 2 new bedrooms, 2 new bathrooms, and laundry.Details
1st floor: remodel existing floor space to 2 new bedrooms, 2 new bathrooms, and laundry. | $114,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 120 Bradford St | reference to complaint #202656089. 1/f: remodel bedroom & bathroom. relocate laundry. 2/f: remodel kitchen & bathroom. add rear deck & replace window with sliding glass door. replace & add windows per plan (all windows to be vinyl)Details
reference to complaint #202656089. 1/f: remodel bedroom & bathroom. relocate laundry. 2/f: remodel kitchen & bathroom. add rear deck & replace window with sliding glass door. replace & add windows per plan (all windows to be vinyl) | $96,500 |
| Apr 17, 2026 | In progress issued Jun 2026 | 153 Madrid St | revision to pa#202602196213, reference to complain #202653040. 1/f: add family room, bathroom, bedroom, wetbar & relocate laundry. 2/f: reconfigure kitchen layout, remodel bathroom, living room & bedroom, add powder room. 3/f: add bathroom & install (4) skylights. replaced and add windows.Details
revision to pa#202602196213, reference to complain #202653040. 1/f: add family room, bathroom, bedroom, wetbar & relocate laundry. 2/f: reconfigure kitchen layout, remodel bathroom, living room & bedroom, add powder room. 3/f: add bathroom & install (4) skylights. replaced and add windows. | $190,000 |
| Feb 26, 2026 | In progress issued Feb 2026 | 245 Westgate Dr | 2/f: remodel kitchen, nook and add one full bathroom per planDetails
2/f: remodel kitchen, nook and add one full bathroom per plan | $50,000 |
| Feb 19, 2026 | In progress issued Feb 2026 | 153 Madrid St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Oct 28, 2025 | In progress issued Oct 2025 | 4845 Geary Bl | remodel kitchen & bathroom in kind. replace interior finishes and install insulation.Details
remodel kitchen & bathroom in kind. replace interior finishes and install insulation. | $50,000 |
| Jul 30, 2025 | In progress issued Aug 2025 | 408 Girard St | 1st/f: relocate laundry, add 1 bathroom, bedroom, media room & kitchenette per planDetails
1st/f: relocate laundry, add 1 bathroom, bedroom, media room & kitchenette per plan | $55,000 |
| Jul 24, 2025 | Completed final sign-off Jan 2026 | 18 Prague St | 1st/f: relocate bathroom, laundry & wet bar. add 1 bedroom & powder rm. 2nd/f: reconfigure bathroom & add 1 bathroom, replace all windows, interior finishes, rear siding, add 3 skylights per planDetails
1st/f: relocate bathroom, laundry & wet bar. add 1 bedroom & powder rm. 2nd/f: reconfigure bathroom & add 1 bathroom, replace all windows, interior finishes, rear siding, add 3 skylights per plan | $108,000 |
| Jul 2, 2025 | In progress issued Aug 2025 | 235 Westgate Dr | 2nd flr remodel (e) kitchen and laundry, enlarge (e) opening. 3rd flr remodel (e) bath and new master bathroom.Details
2nd flr remodel (e) kitchen and laundry, enlarge (e) opening. 3rd flr remodel (e) bath and new master bathroom. | $80,000 |
| Jun 1, 2025 | Completed final sign-off Jan 2026 | 18 Prague St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 89 Naples St | revision to pa 2024-1218-7073 2nd fl: reconfigure kitchen & bathroom layout. 3rd fl: reconfigure bathroom layout per planDetails
revision to pa 2024-1218-7073 2nd fl: reconfigure kitchen & bathroom layout. 3rd fl: reconfigure bathroom layout per plan | $22,000 |
| Dec 23, 2024 | In progress issued Dec 2024 | 7 Alviso St | remodle (2) bathrooms at 2nd fl. replace vanity, shower, toilet & flooringDetails
remodle (2) bathrooms at 2nd fl. replace vanity, shower, toilet & flooring | $43,000 |
| Dec 18, 2024 | Completed final sign-off Nov 2025 | 89 Naples St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s). | $45,000 |
| Oct 2, 2024 | Expired or cancelled expired Mar 2026 | 1371 34th Av | reference to compliant# 202428259. 1st flr: remodel family room & bath room & bedroom. add wet bar. 2nd flr: removed stairway at light well. add rear deck & stairway.Details
reference to compliant# 202428259. 1st flr: remodel family room & bath room & bedroom. add wet bar. 2nd flr: removed stairway at light well. add rear deck & stairway. | $65,000 |
| Jan 16, 2024 | In progress issued Feb 2024 | 123 Parnassus Av | interior remodel: unit 123: covert closet to bathroom. convert family room to bedroom. unit 125: covert closet to bathroom. convert family room to bedroom. remodel kitchen and bathroom. relocate washer and dryer.Details
interior remodel: unit 123: covert closet to bathroom. convert family room to bedroom. unit 125: covert closet to bathroom. convert family room to bedroom. remodel kitchen and bathroom. relocate washer and dryer. | $86,000 |
| Jul 17, 2023 | Completed final sign-off Oct 2025 | 71 Harold Av | 1/f: construct storage to media room and bath, remodel bath and bedrooms, convert laundry to kitchenette (2 burner, no oven)Details
1/f: construct storage to media room and bath, remodel bath and bedrooms, convert laundry to kitchenette (2 burner, no oven) | $56,000 |
| Apr 21, 2023 | Completed final sign-off Apr 2024 | 1824 Silver Av | 1/f: interior remodel, add 1 (n) den, 1 (n) bath, (1 (n) kitchenette and recess garage doorDetails
1/f: interior remodel, add 1 (n) den, 1 (n) bath, (1 (n) kitchenette and recess garage door | $90,000 |
| Dec 15, 2022 | Completed final sign-off Jul 2023 | 123 Escolta Wy | add 1 bedroom & bath, relocate washer & dryer at 1st flr.Details
add 1 bedroom & bath, relocate washer & dryer at 1st flr. | $35,000 |
| Aug 12, 2022 | Completed final sign-off Apr 2023 | 1824 Silver Av | 2/f: interior remodel, no structural, remodel (e) bath & add (1) new bath, relocate kitchen & turn (e) kitchen to den, new flooringn for both levels, replace (e) windows visible form street. to comply with bid complaint #202056601Details
2/f: interior remodel, no structural, remodel (e) bath & add (1) new bath, relocate kitchen & turn (e) kitchen to den, new flooringn for both levels, replace (e) windows visible form street. to comply with bid complaint #202056601 | $200,000 |
| Jun 24, 2022 | Completed final sign-off Jun 2023 | 2663 Alemany Bl | to comply with complaint 202287908 1st fl - convert laundry to kitchenette; relocate washer & dryer; add bath, media room & office; remove unpermitted shed @ rear yardDetails
to comply with complaint 202287908 1st fl - convert laundry to kitchenette; relocate washer & dryer; add bath, media room & office; remove unpermitted shed @ rear yard | $43,000 |
| May 17, 2022 | Completed final sign-off Jun 2022 | 1227 Anza St | unit #6: remodel kitchen & bathroom. no removal of wallsDetails
unit #6: remodel kitchen & bathroom. no removal of walls | $25,000 |
| Mar 21, 2022 | Expired or cancelled expired Nov 2023 | 72 Santa Fe Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $45,000 |
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 216 London St | replace 1 kitchen cabinets on 2nd floor, 1 bathroom cabinets on 2nd floor, repair roof in kind 50 sf max, side in kind.Details
replace 1 kitchen cabinets on 2nd floor, 1 bathroom cabinets on 2nd floor, repair roof in kind 50 sf max, side in kind. | $6,000 |
| Nov 12, 2019 | Expired or cancelled expired Oct 2025 | 71 Harold Av | remodel kitchen & bathroom on 2nd fl in kind.Details
remodel kitchen & bathroom on 2nd fl in kind. | $22,000 |
| Aug 30, 2019 | Completed final sign-off Mar 2021 | 81 Whittier St | legalize 1st floor unit per ordinance# 43-14. (2 bedrooms, 1 bath, kitchen, dining & media room)Details
legalize 1st floor unit per ordinance# 43-14. (2 bedrooms, 1 bath, kitchen, dining & media room) | $46,000 |
| Aug 23, 2019 | Completed final sign-off Jun 2020 | 2115 31st Av | 1st fl: convert family room to bedroom & media room, remodel bath & bedroom. add one full bath. 2nd fl: add half bath & reconfigure bedrooms.Details
1st fl: convert family room to bedroom & media room, remodel bath & bedroom. add one full bath. 2nd fl: add half bath & reconfigure bedrooms. | $55,000 |
| Jan 25, 2019 | Never finaled issued Mar 2020, no final | 7 Maddux Av | add 2 new bedrooms, 1 full bath, 1 media room on the gr fl. relocate e furnace on gr fl and gas meter. foundation & lower floor slab 1-2 feet under seperate permit ref pa#201903185540.Details
add 2 new bedrooms, 1 full bath, 1 media room on the gr fl. relocate e furnace on gr fl and gas meter. foundation & lower floor slab 1-2 feet under seperate permit ref pa#201903185540. | $60,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2020 | 2115 31st Av | remodel kitchen 100 sq & bathroom on 2nd floor, 40 sqDetails
remodel kitchen 100 sq & bathroom on 2nd floor, 40 sq | $15,000 |
| Jun 7, 2018 | Completed final sign-off Nov 2018 | 1754 La Salle Av | comply with complaint 201864581, 201865792, 201869991, 201870001. addtl work 201804125239. replace fence at prop line. 2nd fl add 1 bath, rear deck. 1st fl add family rm, bdrm, media rm, bath, relocate washer dryerDetails
comply with complaint 201864581, 201865792, 201869991, 201870001. addtl work 201804125239. replace fence at prop line. 2nd fl add 1 bath, rear deck. 1st fl add family rm, bdrm, media rm, bath, relocate washer dryer | $54,000 |
| May 8, 2018 | Completed final sign-off Jun 2018 | 166 Albion St | to comply with nov # 201135221 / 201135001 / 201135021 : kitchen & bathroom remodels.Details
to comply with nov # 201135221 / 201135001 / 201135021 : kitchen & bathroom remodels. | |
| Apr 12, 2018 | Completed final sign-off Oct 2018 | 1754 La Salle Av | remodel kitchen & bathroom in 2nd floor, like for like.Details
remodel kitchen & bathroom in 2nd floor, like for like. | $25,000 |
| Mar 27, 2018 | Completed final sign-off Nov 2018 | 242 Country Club Dr | add 2 bedrooms, full bath & media room at 1 st floor per planDetails
add 2 bedrooms, full bath & media room at 1 st floor per plan | $35,000 |
| Jan 5, 2018 | Completed final sign-off Oct 2018 | 242 Country Club Dr | remodel kitchen , 2 bathrooms on 2/f; 1 bathroom on g/f. repair drywall in kind near kitchenDetails
remodel kitchen , 2 bathrooms on 2/f; 1 bathroom on g/f. repair drywall in kind near kitchen | $34,000 |
| Jul 10, 2017 | Completed final sign-off Feb 2019 | 58 Francis St | at 1st fl remodel family rm, remodel/relocate e bath, 2nd fl rmodel e bath, new bedroom, remodel kitchen,laundry,new 1/2 fath, 3rd fl new bedrm,bath. relocate interior stair from 3rd fl to 1st, infill openingDetails
at 1st fl remodel family rm, remodel/relocate e bath, 2nd fl rmodel e bath, new bedroom, remodel kitchen,laundry,new 1/2 fath, 3rd fl new bedrm,bath. relocate interior stair from 3rd fl to 1st, infill opening | $49,000 |
| Apr 28, 2017 | Never finaled issued May 2017, no final | 1686 34th Av | construct 2 bedrooms, 1 full bath room, media room & laundry @ ground floor. convert 1 bath room to 2 full bath room. relocate (e) kitchen convert kitchen space to office at 2nd floorDetails
construct 2 bedrooms, 1 full bath room, media room & laundry @ ground floor. convert 1 bath room to 2 full bath room. relocate (e) kitchen convert kitchen space to office at 2nd floor | $56,000 |
| Mar 21, 2017 | Completed final sign-off Sep 2017 | 238 Thrift St | 2nd fl add 1 full bath and rear deck, 1st fl add 2 bedrooms, 2 full bath, family room storage and laundry per planDetails
2nd fl add 1 full bath and rear deck, 1st fl add 2 bedrooms, 2 full bath, family room storage and laundry per plan | $57,000 |
| Feb 9, 2017 | Never finaled issued Feb 2017, no final | 4843 Geary Bl | unit 4843 great blvd, remodel (e) floor layout inlcuding demo and construction; remodel (e) bathroom and kitchen and rooms; new lighting & outlets and water heater, wall mounted. maher naDetails
unit 4843 great blvd, remodel (e) floor layout inlcuding demo and construction; remodel (e) bathroom and kitchen and rooms; new lighting & outlets and water heater, wall mounted. maher na | $40,000 |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 1449 Powell St | to comply with nov #201614823: install grab bar at hallway showerooms/bathrooms.Details
to comply with nov #201614823: install grab bar at hallway showerooms/bathrooms. | $500 |
| Dec 28, 2016 | Completed final sign-off Feb 2017 | 486 Funston Av | unit #203: remodel kitchen and bathroomDetails
unit #203: remodel kitchen and bathroom | $12,000 |
| Nov 3, 2016 | Completed final sign-off Feb 2017 | 65 Woodward St | comply with nov # 201600602. repair bathroom floorDetails
comply with nov # 201600602. repair bathroom floor | $2,000 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 16 Virginia Av | comply with nov #201630676 - replace tiles, toilets, vanity bathroom on hallway.Details
comply with nov #201630676 - replace tiles, toilets, vanity bathroom on hallway. | $8,000 |
| Oct 11, 2016 | Completed final sign-off Jun 2017 | 238 Thrift St | replace kitchen cabinet, floor tile. bathroom vanity, toilet. no structural workDetails
replace kitchen cabinet, floor tile. bathroom vanity, toilet. no structural work | $5,000 |
| Sep 16, 2016 | Never finaled issued Sep 2016, no final | 1500 Powell St | work in 9 units total; common baths/kitchen on 2/3/f; replace bathroom toilet, sink, _________ in units 2,8,9,12-1/2,11,21,24,26 & 28. repair drywall, tiles, paint, hardwood floor, replace bathroom toilet sink, shower pan 2 on 2/f 2 on 3/f hallway; kitechen cabinet on 2/3/f. no walls moved/removed.Details
work in 9 units total; common baths/kitchen on 2/3/f; replace bathroom toilet, sink, _________ in units 2,8,9,12-1/2,11,21,24,26 & 28. repair drywall, tiles, paint, hardwood floor, replace bathroom toilet sink, shower pan 2 on 2/f 2 on 3/f hallway; kitechen cabinet on 2/3/f. no walls moved/removed. | $60,000 |
| Sep 8, 2016 | Expired or cancelled expired Jan 2018 | 2118 Revere Av | 1) comply with complaint #201624083. 2)add 2 bedrooms, laundry, 2 full bath and media room at basement floor per plan.Details
1) comply with complaint #201624083. 2)add 2 bedrooms, laundry, 2 full bath and media room at basement floor per plan. | $46,300 |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 1449 Powell St | comply w/nov #201625452 unit #2 & #34 -replace kitchen cabinet, bathroom vanity, tiles, unit #35 -replace vanity tiles, repair drywall in kind, paint interior, replace floor. replace tile in 4 bathrooms, 2 kitchen cabinet on hallway. no walls moved, removed, added or infilled. all layouts to remainDetails
comply w/nov #201625452 unit #2 & #34 -replace kitchen cabinet, bathroom vanity, tiles, unit #35 -replace vanity tiles, repair drywall in kind, paint interior, replace floor. replace tile in 4 bathrooms, 2 kitchen cabinet on hallway. no walls moved, removed, added or infilled. all layouts to remain | $60,000 |
| Jun 2, 2016 | Completed final sign-off Feb 2017 | 345 San Jose Av | remodel unit 345 & 349. bathroom & kitchens. to comply with nov #201334071 & 201539821. in kind, kitchen & bath.Details
remodel unit 345 & 349. bathroom & kitchens. to comply with nov #201334071 & 201539821. in kind, kitchen & bath. | $25,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 467 Urbano Dr | add one full bathroom, relocated laundry & bathroom door at 2nd floorDetails
add one full bathroom, relocated laundry & bathroom door at 2nd floor | $15,000 |
| Apr 11, 2016 | Expired or cancelled expired Jan 2018 | 2118 Revere Av | remodel kitchen, bathroom, repair siding (50 sq ft), repair roof, repair drywall (100 sf) in-kind. install 4 windows at rear in kind.Details
remodel kitchen, bathroom, repair siding (50 sq ft), repair roof, repair drywall (100 sf) in-kind. install 4 windows at rear in kind. | $20,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 72 Valley St | replace kitchen cabinet, replace 5 bathroom toilets & vanity, convert 2 bathtub to shower pan, (3) bath fans to remain.Details
replace kitchen cabinet, replace 5 bathroom toilets & vanity, convert 2 bathtub to shower pan, (3) bath fans to remain. | $35,000 |
| Feb 3, 2016 | Completed final sign-off Feb 2017 | 31 Cayuga Av | add one new entertainment room and one bathroom on 1st floor per plan.Details
add one new entertainment room and one bathroom on 1st floor per plan. | $3,000 |
| Jan 28, 2016 | Completed final sign-off Apr 2016 | 876 Foerster St | remodel kitchen, 2 bathroom on 2nd floor, repair hardwood floor, remodel at the same area.Details
remodel kitchen, 2 bathroom on 2nd floor, repair hardwood floor, remodel at the same area. | $20,000 |
| Dec 28, 2015 | Completed final sign-off Oct 2016 | 1459 Thomas Av | legalize 1 bathroom, remodel 2 kitchens, 3 bathrooms, repair siding, stucco, roof, drywall in-kind. paint interior & exterior.Details
legalize 1 bathroom, remodel 2 kitchens, 3 bathrooms, repair siding, stucco, roof, drywall in-kind. paint interior & exterior. | $30,000 |
| Nov 9, 2015 | Never finaled issued Nov 2015, no final | 31 Saint Charles Av | add 2 bedrooms, 2 baths, 1 mud room on 1st fl per plan. relocate water heater and (e) furnace on 1st fl per planDetails
add 2 bedrooms, 2 baths, 1 mud room on 1st fl per plan. relocate water heater and (e) furnace on 1st fl per plan | $35,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2016 | 139 Maddux Av | add bedroom, bathroom, family room and laundry at 1st floor. add deck & stairs at rearDetails
add bedroom, bathroom, family room and laundry at 1st floor. add deck & stairs at rear | $35,000 |
| Sep 30, 2015 | Never finaled issued Sep 2015, no final | 776 Pine St | comply with n.o.v. # 201558591, 201559161 & 201541401. replace vanity, tiles in bathroom. repair drywall in bathroom and kitchen.Details
comply with n.o.v. # 201558591, 201559161 & 201541401. replace vanity, tiles in bathroom. repair drywall in bathroom and kitchen. | $3,000 |
| Aug 17, 2015 | Completed final sign-off Jan 2016 | 139 Maddux Av | replace kitchen countertop and tile; replace bathroom vanity & tile.Details
replace kitchen countertop and tile; replace bathroom vanity & tile. | $3,000 |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 408 Somerset St | replace kitchen cabintets, bathroom vanity. only cabinets.Details
replace kitchen cabintets, bathroom vanity. only cabinets. | $5,000 |
| May 1, 2015 | Never finaled issued May 2015, no final | 59 Bernard St | replace cabinet in kitchen & replace vanity, toilet bath tub in bathroom, no relocation of walls & fixtures; all same location (no new lighting/exhaust)Details
replace cabinet in kitchen & replace vanity, toilet bath tub in bathroom, no relocation of walls & fixtures; all same location (no new lighting/exhaust) | $10,000 |
| Apr 8, 2015 | Completed final sign-off Mar 2016 | 310 Orizaba Av | convert (e) storage #1 into bedroom on ground lvl. convert (e) stroage #3 into laundry room on grnd lvl. add 1 game room, 2 bathrooms on grnd lvl. relocate w/d. ref pa 2012 1102 3400 comply violation #201516681Details
convert (e) storage #1 into bedroom on ground lvl. convert (e) stroage #3 into laundry room on grnd lvl. add 1 game room, 2 bathrooms on grnd lvl. relocate w/d. ref pa 2012 1102 3400 comply violation #201516681 | $25,000 |
| Apr 7, 2015 | Completed final sign-off Oct 2015 | 125 Chester Av | remodel kitchen (10'x12') and bathroom (5'x8'), refinish hardwood floor, paint interior and exterior. replace garage door in kind, windows. replace 8 windows in front and 7 vinyl winodws at the back. replace water heater.Details
remodel kitchen (10'x12') and bathroom (5'x8'), refinish hardwood floor, paint interior and exterior. replace garage door in kind, windows. replace 8 windows in front and 7 vinyl winodws at the back. replace water heater. | $50,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2015 | 536 Peru Av | garage level, 1st fl, construct new walls for new bath, new family, laundry and bedroom. relocate (e) water heater and furnace; new outlets and light fixtuers, no expansion of bldg footprint.Details
garage level, 1st fl, construct new walls for new bath, new family, laundry and bedroom. relocate (e) water heater and furnace; new outlets and light fixtuers, no expansion of bldg footprint. | $45,000 |
| Mar 20, 2015 | Completed final sign-off Aug 2015 | 642 Head St | construct one (n) bath & two bedrooms on ground floor. convert (e) dining room to study room, add (n) bath & remodel (e) kitchen on 2nd floor. replace (e) water heater & furnace.Details
construct one (n) bath & two bedrooms on ground floor. convert (e) dining room to study room, add (n) bath & remodel (e) kitchen on 2nd floor. replace (e) water heater & furnace. | $56,000 |
| Feb 17, 2015 | Completed final sign-off Jun 2016 | 218 Madison St | 1/ comply with complaint 201527122 2/ remodel laundry at basement floor 3/ add full bath room at 2/f; 4/ add 6 skylight and replace windows at rear; 5/ voluntary strenthening partial existing foundationDetails
1/ comply with complaint 201527122 2/ remodel laundry at basement floor 3/ add full bath room at 2/f; 4/ add 6 skylight and replace windows at rear; 5/ voluntary strenthening partial existing foundation | $47,600 |
| Aug 21, 2014 | Completed final sign-off Apr 2015 | 2250 34th Av | comply with complaint #201489971 media room; add 2 bedrooms, one bath room & laundry at 1st flr per plan. add deck at rear at 2/f.Details
comply with complaint #201489971 media room; add 2 bedrooms, one bath room & laundry at 1st flr per plan. add deck at rear at 2/f. | $46,500 |
| Jun 30, 2014 | Completed final sign-off Apr 2015 | 2250 34th Av | remodel (2) bathroom (1) kitchen, paint interior & exterior repair roof & exterior wall, repair deck in kind at rearDetails
remodel (2) bathroom (1) kitchen, paint interior & exterior repair roof & exterior wall, repair deck in kind at rear | $1,500 |
| Mar 26, 2014 | Never finaled issued May 2014, no final | 247 Brighton Av | comply with complaint #201450561 to remove illegal kitchen, bathroom, and bedroom per plan. legalize undocument structure under separate permit #201405206174. remove kitchen and bathroom cabinets and fixtures all electrical and plumbing to its source.Details
comply with complaint #201450561 to remove illegal kitchen, bathroom, and bedroom per plan. legalize undocument structure under separate permit #201405206174. remove kitchen and bathroom cabinets and fixtures all electrical and plumbing to its source. | $10,000 |
| Feb 14, 2014 | Completed final sign-off May 2014 | 584 Silver Av | comply w/compliant #201452031 -add 2 bedroom, full bath and laundry room at 1st fl per plan. infill garage door at front and add new window opening at side.(e) curb cut to be remove, (n) curb to be add & match adjacent at silver ave.Details
comply w/compliant #201452031 -add 2 bedroom, full bath and laundry room at 1st fl per plan. infill garage door at front and add new window opening at side.(e) curb cut to be remove, (n) curb to be add & match adjacent at silver ave. | $32,600 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 584 Silver Av | remodel 1 kitchen, 2 bathrooms paint interior & exterior wall and ceiling, replace roof membrane onlyDetails
remodel 1 kitchen, 2 bathrooms paint interior & exterior wall and ceiling, replace roof membrane only | $8,000 |
| Nov 6, 2013 | Completed final sign-off Jun 2014 | 2209 Cayuga Av | comply with complaint #201330791. remove unpermitted kitchen at ground floor, legalized home office, 2 bathrooms, bedroom & laundry at ground floor.Details
comply with complaint #201330791. remove unpermitted kitchen at ground floor, legalized home office, 2 bathrooms, bedroom & laundry at ground floor. | $33,200 |
| Aug 29, 2013 | Completed final sign-off Jan 2014 | 1550 33rd Av | rev. to pa#201306210136 convert 2dn floor office to full bath.Details
rev. to pa#201306210136 convert 2dn floor office to full bath. | $10,000 |
| Jun 21, 2013 | Completed final sign-off Jan 2014 | 1550 33rd Av | infill rear portion at ground floor. add family, bedroom, bath and laundry room on ground floor. new interior stair to 2nd floor.Details
infill rear portion at ground floor. add family, bedroom, bath and laundry room on ground floor. new interior stair to 2nd floor. | $60,000 |
| Sep 25, 2012 | Completed final sign-off Mar 2013 | 535 Mangels Av | to add two bedroom. one playroom, one full bathroom & laundry area existing kitchen and bathroom on 2nd floor. replace rear existing three window, one patio door in kind on 2nd floor. replace rear damaged stud wall & roofing.Details
to add two bedroom. one playroom, one full bathroom & laundry area existing kitchen and bathroom on 2nd floor. replace rear existing three window, one patio door in kind on 2nd floor. replace rear damaged stud wall & roofing. | $65,000 |
| Sep 18, 2012 | Completed final sign-off Mar 2013 | 2700 42nd Av | to remodel ground floor:add one bedroom, family room, full bath and laundry room.Details
to remodel ground floor:add one bedroom, family room, full bath and laundry room. | $40,000 |
| Sep 7, 2012 | Completed final sign-off Nov 2013 | 1371 34th Av | 1) legalize one bathroom on ground floor per plan to comply with complaint #201259941. 2) replace kitchen cabinets an dretile kitchen floor at 2nd floor per plan.Details
1) legalize one bathroom on ground floor per plan to comply with complaint #201259941. 2) replace kitchen cabinets an dretile kitchen floor at 2nd floor per plan. | $9,000 |
| Jul 23, 2012 | Completed final sign-off Dec 2012 | 255 Farallones St | to add two bedrooms, one full bathroom, one storage & laundry area on existing ground floor per plan.Details
to add two bedrooms, one full bathroom, one storage & laundry area on existing ground floor per plan. | $45,000 |
| Jun 28, 2012 | Completed final sign-off Nov 2012 | 4485 17th St | add bedroom & bathroom at 1st. floor. relocate (e) water heater & furnace at garage. relocate (e) washer & dryer machine at garage. relocate (e) electrical meter. replace (e) window at garage at rear side.Details
add bedroom & bathroom at 1st. floor. relocate (e) water heater & furnace at garage. relocate (e) washer & dryer machine at garage. relocate (e) electrical meter. replace (e) window at garage at rear side. | $18,000 |
| May 1, 2012 | Completed final sign-off Sep 2012 | 106 Lathrop Av | remodel gr fl, add 2 bedrooms, 2 full baths, 2 storage rooms, add 2nd floor deck and stairs to backyardDetails
remodel gr fl, add 2 bedrooms, 2 full baths, 2 storage rooms, add 2nd floor deck and stairs to backyard | $50,000 |
| Apr 24, 2012 | Completed final sign-off Oct 2012 | 551 Edinburgh St | replace 2nd floor windows with vinyl type except street front with wood clad windows. remodel 1st floor. add 2 bedrooms storage and full bath.Details
replace 2nd floor windows with vinyl type except street front with wood clad windows. remodel 1st floor. add 2 bedrooms storage and full bath. | $40,000 |
| Feb 13, 2012 | Completed final sign-off Apr 2012 | 614 38th Av | legalize as built rooms-1 bedroom, 1 storage room & 1 full bathroom, family room on 1st floor (garage). add full bathroom on 2nd floorDetails
legalize as built rooms-1 bedroom, 1 storage room & 1 full bathroom, family room on 1st floor (garage). add full bathroom on 2nd floor | $30,000 |
| Feb 9, 2012 | Completed final sign-off Apr 2012 | 238 Leland Av | to comply 201195966. remove ground floor rooms and bath. convert back to original garage/storage.Details
to comply 201195966. remove ground floor rooms and bath. convert back to original garage/storage. | $6,000 |
| Jan 26, 2012 | Completed final sign-off Sep 2012 | 876 Girard St | comply with nov 201178673. legalize storage and half bath at 1st floor. legalize 3rd bedroom & 1 full bathroom on 2nd floor. (deck and retaining wall on separate permit)Details
comply with nov 201178673. legalize storage and half bath at 1st floor. legalize 3rd bedroom & 1 full bathroom on 2nd floor. (deck and retaining wall on separate permit) | $16,000 |
| Dec 28, 2011 | Completed final sign-off Aug 2012 | 2218 34th Av | to add 2 bedrooms, one full bath room and laundry area on extg ground floor per plan.Details
to add 2 bedrooms, one full bath room and laundry area on extg ground floor per plan. | $45,000 |
| Nov 29, 2011 | Completed final sign-off Feb 2012 | 47 Topeka Av | gr floor remodel. legalize bedroom, bath, laundry, storage, tool room, add bedroom and bath at gr fl. comply with nov 200668164Details
gr floor remodel. legalize bedroom, bath, laundry, storage, tool room, add bedroom and bath at gr fl. comply with nov 200668164 | $35,000 |
| Nov 17, 2011 | Completed final sign-off Dec 2011 | 188 Broad St | demolish rooms and bathroom on 1st floor per plan. (app 987084) and comply with nov 200119213 and 200851013Details
demolish rooms and bathroom on 1st floor per plan. (app 987084) and comply with nov 200119213 and 200851013 | $50,000 |
| Sep 8, 2011 | Completed final sign-off Dec 2011 | 53 Granada Av | remodel ground floor: add one bedroom, one full bath, laundry & 2 storage rooms.Details
remodel ground floor: add one bedroom, one full bath, laundry & 2 storage rooms. | $40,000 |
| Aug 3, 2011 | Never finaled issued Aug 2011, no final | 2001 Sacramento St | remodel kitchen, 2 baths, 1 additional bathroom. remodel study and associated misc work to apt 7, a condominium aptDetails
remodel kitchen, 2 baths, 1 additional bathroom. remodel study and associated misc work to apt 7, a condominium apt | $40,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2012 | 614 Haight St | restore kitchen and bathrooms damaged by fire and associated miscellaneous work.Details
restore kitchen and bathrooms damaged by fire and associated miscellaneous work. | $24,000 |
| Apr 1, 2011 | Completed final sign-off Jul 2011 | 176 Holladay Av | revision to appl #201011165028: construct (n) half bath on 2nd floor, repair & replace damaged siding on exterior front wall, replace all (e) windows - wood in front, vinyl at side & back.Details
revision to appl #201011165028: construct (n) half bath on 2nd floor, repair & replace damaged siding on exterior front wall, replace all (e) windows - wood in front, vinyl at side & back. | $8,000 |
| Nov 16, 2010 | Completed final sign-off Aug 2011 | 176 Holladay Av | upgrade e partial foundation, repair e exterior and interior stairs. new study room, new family room on gr fl. removel e kitchen, rel0cate e bath on 2nd fl. reocate e bath, remove e deck on attic floor. replace drywall in kind with area = 100 sq ft.Details
upgrade e partial foundation, repair e exterior and interior stairs. new study room, new family room on gr fl. removel e kitchen, rel0cate e bath on 2nd fl. reocate e bath, remove e deck on attic floor. replace drywall in kind with area = 100 sq ft. | $60,000 |
| Aug 12, 2010 | Completed final sign-off Sep 2010 | 484 Leland Av | to respond complaint #201033265 dated may 18,2010. 1) on ground floor: reduce illegal full bathroom to new half bathroom. remove shower pan. 2) on 1st floor:convert illegal kitchen to new laundry use,(remove stove, cabinet, sink to source) and legalize extg kitchen plumbing and electrical.Details
to respond complaint #201033265 dated may 18,2010. 1) on ground floor: reduce illegal full bathroom to new half bathroom. remove shower pan. 2) on 1st floor:convert illegal kitchen to new laundry use,(remove stove, cabinet, sink to source) and legalize extg kitchen plumbing and electrical. | $50,000 |
| Jul 27, 2010 | Completed final sign-off May 2011 | 850 Steiner St | revision to pa# 2010.07.08.6183. lower level interior atlterations. remove one shower and legalize existing half bath. add 1 full bathroom and create a media room, library and utility room. add sliding doors to (e) deck.Details
revision to pa# 2010.07.08.6183. lower level interior atlterations. remove one shower and legalize existing half bath. add 1 full bathroom and create a media room, library and utility room. add sliding doors to (e) deck. | $35,000 |
| Jul 8, 2010 | Completed final sign-off May 2011 | 850 Steiner St | 1st fl: renovation of kitch. new bay wdw w/ door to (e) rear deck. 2nd fl: reno of bedrm # 2,3. reno of bathrm to 2 bathrooms. enlarge (e) lavatory btn bedrmd no 1&2 to create full bathrm. reno to create dressing rm.Details
1st fl: renovation of kitch. new bay wdw w/ door to (e) rear deck. 2nd fl: reno of bedrm # 2,3. reno of bathrm to 2 bathrooms. enlarge (e) lavatory btn bedrmd no 1&2 to create full bathrm. reno to create dressing rm. | $50,000 |
| Jul 6, 2010 | Completed final sign-off Jan 2011 | 160 Marston Av | lower lvl: remodel (e) kitchen and remove wall bth kitchen area and dining area. upper level: remodel (e) closet and bathroom. replace any broken windows at rear.Details
lower lvl: remodel (e) kitchen and remove wall bth kitchen area and dining area. upper level: remodel (e) closet and bathroom. replace any broken windows at rear. | $41,117 |
| Mar 31, 2010 | Completed final sign-off Aug 2010 | 1012 Divisadero St | renovation of unit# 2 on 2nd and 3rd floors consisting of : remove and install new wall and ceiling finishes, update/install new plumbing and elec. systems, renovate 2 bathrooms, add one full bath room, install new kitchen cabinet work and appliances.Details
renovation of unit# 2 on 2nd and 3rd floors consisting of : remove and install new wall and ceiling finishes, update/install new plumbing and elec. systems, renovate 2 bathrooms, add one full bath room, install new kitchen cabinet work and appliances. | $75,000 |
| Mar 11, 2010 | Completed final sign-off Sep 2010 | 2518 34th Av | construct two bedrooms, play room and a full bath room on the ground/first floor.Details
construct two bedrooms, play room and a full bath room on the ground/first floor. | $33,000 |
| Feb 26, 2010 | Completed final sign-off Jun 2010 | 3162 San Jose Av | 1. one new bedroom, study rm. & two 1/2 bath rm. one storage rm. to be constructed at ground floor. 2. replace (e) slab with new at same elevation.Details
1. one new bedroom, study rm. & two 1/2 bath rm. one storage rm. to be constructed at ground floor. 2. replace (e) slab with new at same elevation. | $33,000 |
| Jan 26, 2010 | Completed final sign-off Jun 2010 | 1561 Mason St | convert rear basement storage area to (n) bedroom, study room, bath and storage area voluntary reinforce some (e) walls and one section of foundation.Details
convert rear basement storage area to (n) bedroom, study room, bath and storage area voluntary reinforce some (e) walls and one section of foundation. | $20,000 |
| Dec 23, 2008 | Completed final sign-off Nov 2009 | 467 Urbano Dr | revision to #200809050926. rewire dinning room, bedroom, kitchen, bathroom, livingroom. replace bath tub, shower, toilet, vanity, new stucco on all exterior wall. no lighting work.Details
revision to #200809050926. rewire dinning room, bedroom, kitchen, bathroom, livingroom. replace bath tub, shower, toilet, vanity, new stucco on all exterior wall. no lighting work. | $10,000 |
| Sep 12, 2008 | Completed final sign-off Jan 2009 | 1196 Broadway | bathroom/kitchen renovation - apartment #11; bathroom: replace toilet, cabinets, tile; kitchen: replace flooring, cabinets, countertop. no window and no door work; (exterior for walls less than 5' from property line install 1 hr wall use 1 layer of type x gypboard.Details
bathroom/kitchen renovation - apartment #11; bathroom: replace toilet, cabinets, tile; kitchen: replace flooring, cabinets, countertop. no window and no door work; (exterior for walls less than 5' from property line install 1 hr wall use 1 layer of type x gypboard. | $7,000 |
| Sep 5, 2008 | Completed final sign-off Nov 2009 | 467 Urbano Dr | remodel (e)kitchen, repl cabinets, counter top, appliances, & title on 2nd flr, add 2 bedrms at grnd flr, convert (e)bedrm to a family rm, convert (e)storage to full bath at grnd flrDetails
remodel (e)kitchen, repl cabinets, counter top, appliances, & title on 2nd flr, add 2 bedrms at grnd flr, convert (e)bedrm to a family rm, convert (e)storage to full bath at grnd flr | $35,000 |