Block 3026, lot 056
876 Foerster St
- City’s use
- Single Family Residential
- Built
- 1957
- Stories
- 2
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 2,383 sq ft
- Lot
- 4,360 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2016 | Completed final sign-off Apr 2016 | 876 Foerster St | Mz Construction Company | remodel kitchen, 2 bathroom on 2nd floor, repair hardwood floor, remodel at the same area.Details
remodel kitchen, 2 bathroom on 2nd floor, repair hardwood floor, remodel at the same area. | $20,000 |
| Nov 30, 2015 | Completed final sign-off Apr 2016 | 876 Foerster St | Mz Construction Company | windows to be replaced with new windows (existing ones old + fogged) 2 street side. 9 not facing public view.Details
windows to be replaced with new windows (existing ones old + fogged) 2 street side. 9 not facing public view. | $20,000 |
| Sep 2, 2015 | Completed final sign-off Dec 2015 | 876 Foerster St | Joseph Cioni General Contractor | remodel ground floor bathroom in kind, replace exhaust fan, bathroom in-kind, convert tub to shower. add wall outlets on ground floor living room. add 4 recessed led lights in ground floor living roomDetails
remodel ground floor bathroom in kind, replace exhaust fan, bathroom in-kind, convert tub to shower. add wall outlets on ground floor living room. add 4 recessed led lights in ground floor living room | $14,650 |
| May 20, 2015 | Completed final sign-off Jul 2015 | 876 Foerster St | Joseph Cioni General Contractor | repair less than 50% of extg deck at rear yard. replace dry rot. repair railings. all repairs in kind.Details
repair less than 50% of extg deck at rear yard. replace dry rot. repair railings. all repairs in kind. | $5,000 |
| Jan 7, 2015 | Completed final sign-off Mar 2015 | 876 Foerster St | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $22,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Joseph Cioni General Contractor (2), Mz Construction Company (2), Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.