Mxl Commercial Construction
- Based in
- Alameda,
- On San Francisco permits
- Sep 2011 to Oct 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 7 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2011 | Completed final sign-off Feb 2012 | 536 Castro St | retail ti to create a new dog supply and wash service to include replacing wood floor w/concrete slab, provide heating system, install dog washing tubs, new lighting, & accessible upgrades. replace existing stair.Details
retail ti to create a new dog supply and wash service to include replacing wood floor w/concrete slab, provide heating system, install dog washing tubs, new lighting, & accessible upgrades. replace existing stair. | $37,386 |