Back to bathroom remodel contractors
Mullins General Construction & Fine Pain
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to May 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 20 completed, 6 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 4 completed, 3 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2024 | Completed final sign-off Jan 2025 | 299 Webster St | unit #525: demo (e) kitchen and bathroom cabinets and wall finishes. install new kitchen cabinets, perform cosmetic bathroom remodel.Details
unit #525: demo (e) kitchen and bathroom cabinets and wall finishes. install new kitchen cabinets, perform cosmetic bathroom remodel. | $15,000 |
| Jan 5, 2022 | Completed final sign-off Feb 2022 | 3220 23rd St | to comply with nov 202185159 work to include exploratory demo of bathroom finishes and replacement. repair less than 50% of the new rear staircase.Details
to comply with nov 202185159 work to include exploratory demo of bathroom finishes and replacement. repair less than 50% of the new rear staircase. | $1,500 |
| May 21, 2021 | Never finaled issued Apr 2022, no final | 446 34th Av | remodel garage area and convert (e) 1st floor storage area into a (n) family room with one full bath, (n) furnace, and (n) water heater. construct (n) deck at the rear yard.Details
remodel garage area and convert (e) 1st floor storage area into a (n) family room with one full bath, (n) furnace, and (n) water heater. construct (n) deck at the rear yard. | $15,000 |
| Oct 18, 2017 | Expired or cancelled expired Oct 2023 | 87 Dolores St | install 30 fan coil units, install vent pipes for 30 bathroom exhaust fans, fire repair. ref. 201602129526.Details
install 30 fan coil units, install vent pipes for 30 bathroom exhaust fans, fire repair. ref. 201602129526. | $150,000 |
| Jan 5, 2017 | Completed final sign-off Dec 2017 | 4832 25th St | repair in-kind fire damaged structural elements of extg 3rd floor east wall approx. 22 linear ft. remove and replace extg drywall on 3rd floor. r/r extg rear window & slider door. gut extg 3rd floor bath & replace in kind fixtures. patch extg drywall in 2 bedrooms on 1st & 2nd floor.Details
repair in-kind fire damaged structural elements of extg 3rd floor east wall approx. 22 linear ft. remove and replace extg drywall on 3rd floor. r/r extg rear window & slider door. gut extg 3rd floor bath & replace in kind fixtures. patch extg drywall in 2 bedrooms on 1st & 2nd floor. | $50,000 |
| Apr 20, 2016 | Never finaled issued Apr 2016, no final | 939 Noe St | to comply w/ nov#201604151. repair large opening as described on nov#201604151 in bathroom of apt#2. remove damaged plaster & lathe & replace w/ 5/8" type x dry wall. apply tape & joint compound & prime/paint bathroom.Details
to comply w/ nov#201604151. repair large opening as described on nov#201604151 in bathroom of apt#2. remove damaged plaster & lathe & replace w/ 5/8" type x dry wall. apply tape & joint compound & prime/paint bathroom. | $750 |
| Sep 4, 2015 | Never finaled issued Sep 2015, no final | 3549 24th St | remodel (e) kitchen & bathroom; remove (e) bedroom & add 2nd full baths. no structural work. replace(e) window in bathroom & kitchen - not visible from street. replace (e) w/h; install lighting & req's circuits in entire apt.Details
remodel (e) kitchen & bathroom; remove (e) bedroom & add 2nd full baths. no structural work. replace(e) window in bathroom & kitchen - not visible from street. replace (e) w/h; install lighting & req's circuits in entire apt. | $25,000 |
| May 22, 2014 | Completed final sign-off Nov 2018 | 87 Dolores St | comply with nov 201467291,201464112 fire damage. repair/replace entire roof sheathing, 40ft x3 ft roof framing, replace gyp bd halls, stairs. replace kitchen and bath, 12 units. replace interior gyp bd 40%. elevator, mep, sprinkler,alarm sep permitDetails
comply with nov 201467291,201464112 fire damage. repair/replace entire roof sheathing, 40ft x3 ft roof framing, replace gyp bd halls, stairs. replace kitchen and bath, 12 units. replace interior gyp bd 40%. elevator, mep, sprinkler,alarm sep permit | $1,200,000 |