Permit GraphShortlistSan Francisco building permits since 2000

Block 0849, lot 001

299 Webster St

City’s use
Multi-Family Residential
Built
1900
Stories
2
Units
6
Rooms
6 bathrooms
Building
4,700 sq ft
Lot
2,500 sq ft
Zoning
RM1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 29, 2024Completed
final sign-off Jan 2025
299 Webster StMullins General Construction & Fine Painunit #525: demo (e) kitchen and bathroom cabinets and wall finishes. install new kitchen cabinets, perform cosmetic bathroom remodel.
Details
Permit
202407297451
Status
complete
Filed
Jul 29, 2024
Permit issued
Jul 29, 2024
Final sign-off
Jan 17, 2025
Declared cost
$15,000
Address
299 Webster St

unit #525: demo (e) kitchen and bathroom cabinets and wall finishes. install new kitchen cabinets, perform cosmetic bathroom remodel.

Open the permit page

$15,000
Mar 29, 2023Never finaled
issued Mar 2023, no final
299 Webster StMullins General Construction & Fine Painrear bldg/ repair terrazzo steps. all work to be completed in kind and less than 50% of framing members needs t0 be replaced
Details
Permit
202303294634
Status
issued
Filed
Mar 29, 2023
Permit issued
Mar 29, 2023
Declared cost
$5,000
Address
299 Webster St

rear bldg/ repair terrazzo steps. all work to be completed in kind and less than 50% of framing members needs t0 be replaced

Open the permit page

$5,000
Mar 19, 2018Completed
final sign-off Mar 2018
299 Webster StMullins General Construction & Fine Paininstall 5/8 type x drywall to ceiling of garage#8 & fire type per nov#201845087 item#2.
Details
Permit
201803193968
Status
complete
Filed
Mar 19, 2018
Permit issued
Mar 19, 2018
Final sign-off
Mar 28, 2018
Declared cost
$750
Address
299 Webster St

install 5/8 type x drywall to ceiling of garage#8 & fire type per nov#201845087 item#2.

Open the permit page

$750
Jan 29, 2018Completed
final sign-off Mar 2018
299 Webster StKelly And Sonto comply with nov #201724164. install 1 fire sprinkler head - 1" garbage shoot. to comply with the nov issued by the building department. this is a replacement, upgrade from an existing sprinkler in the garbage shoot.
Details
Permit
201801299724
Status
complete
Filed
Jan 29, 2018
Permit issued
Jan 29, 2018
Final sign-off
Mar 6, 2018
Declared cost
$1,425
Address
299 Webster St

to comply with nov #201724164. install 1 fire sprinkler head - 1" garbage shoot. to comply with the nov issued by the building department. this is a replacement, upgrade from an existing sprinkler in the garbage shoot.

Open the permit page

$1,425
Apr 9, 2012Never finaled
issued Apr 2012, no final
299 Webster StMullins General Construction & Fine Painvoluntary strenthening. install steel frame inside garage, 1st and 2nd fl. not seen from street. install perimeter and interior foundation bolts.
Details
Permit
201204097905
Status
issued
Filed
Apr 9, 2012
Permit issued
Apr 12, 2012
Declared cost
$15,000
Address
299 Webster St

voluntary strenthening. install steel frame inside garage, 1st and 2nd fl. not seen from street. install perimeter and interior foundation bolts.

Open the permit page

$15,000
Jun 26, 2006Never finaled
issued Jun 2006, no final
299 Webster Ststreet space & sidewalk permit only.
Details
Permit
M38245
Status
issued
Filed
Jun 26, 2006
Permit issued
Jun 26, 2006
Address
299 Webster St

street space & sidewalk permit only.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Mullins General Construction & Fine Pain (3), Kelly And Son, Mullins General Construction & Fine Pain
Engineers
Philip Whitehead

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.