Mr Lin Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Oct 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 10 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 43 days from filing to permit and 394 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2025 | In progress issued Oct 2025 | 4505 California St | unit 7: bathroom remodel in kind - replace drywall, tiles, fixtures in kind. replace damaged drywall at one bedroom wall in kind (100 sf). no change to wall layout. no change to floor layout. no structural work. all replacement drywall to be 5/8" type x w/ 5d cooler nails @ 4" oc or equivalent screwDetails
unit 7: bathroom remodel in kind - replace drywall, tiles, fixtures in kind. replace damaged drywall at one bedroom wall in kind (100 sf). no change to wall layout. no change to floor layout. no structural work. all replacement drywall to be 5/8" type x w/ 5d cooler nails @ 4" oc or equivalent screw | $9,000 |
| May 6, 2022 | Completed final sign-off Jul 2023 | 158 Edinburgh St | revision to pa#202109309601 to comply to nov #202182956. interior remodel for basement, 1st floor and 2nd floor with bathroom reconfiguration. remove partition, recondfigure the layout per plan.Details
revision to pa#202109309601 to comply to nov #202182956. interior remodel for basement, 1st floor and 2nd floor with bathroom reconfiguration. remove partition, recondfigure the layout per plan. | $12,000 |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 158 Edinburgh St | replace vinyl windows: 3 at master bedroom, 1 guest bedroom, 1 kitchen, 1 at each bathroom. 3 at basement level. replace wood clad windows for bay windows at 1 bedroom window. 2 windows street facing.Details
replace vinyl windows: 3 at master bedroom, 1 guest bedroom, 1 kitchen, 1 at each bathroom. 3 at basement level. replace wood clad windows for bay windows at 1 bedroom window. 2 windows street facing. | $15,000 |
| Sep 30, 2021 | Completed final sign-off Jul 2023 | 158 Edinburgh St | construct family room & bathroom at basement level. legalize bedroom, bathroom, media room, & kitchenette at g/f. relocate kitchen, remodel (e) bathroom, add 1 full bath, & replace (e) sheetrock w/ new at 2nd floor.Details
construct family room & bathroom at basement level. legalize bedroom, bathroom, media room, & kitchenette at g/f. relocate kitchen, remodel (e) bathroom, add 1 full bath, & replace (e) sheetrock w/ new at 2nd floor. | $120,000 |
| Feb 2, 2021 | Completed final sign-off Jul 2024 | 1838 41st Av | legalization of unit: 1 bedroom, 1 bathroom, 1 kitchen.Details
legalization of unit: 1 bedroom, 1 bathroom, 1 kitchen. | $40,000 |