Mr Lin Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Oct 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 10 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2025 | In progress issued Oct 2025 | 4505 California St | unit 7: bathroom remodel in kind - replace drywall, tiles, fixtures in kind. replace damaged drywall at one bedroom wall in kind (100 sf). no change to wall layout. no change to floor layout. no structural work. all replacement drywall to be 5/8" type x w/ 5d cooler nails @ 4" oc or equivalent screwDetails
unit 7: bathroom remodel in kind - replace drywall, tiles, fixtures in kind. replace damaged drywall at one bedroom wall in kind (100 sf). no change to wall layout. no change to floor layout. no structural work. all replacement drywall to be 5/8" type x w/ 5d cooler nails @ 4" oc or equivalent screw | $9,000 |
| Aug 6, 2025 | Completed final sign-off Sep 2025 | 4605 Balboa St | fix the clay tile wall at laundry/utility room and concrete step. to comply nov #202538627. #2,3, and 5Details
fix the clay tile wall at laundry/utility room and concrete step. to comply nov #202538627. #2,3, and 5 | $2,000 |
| Sep 25, 2024 | Completed final sign-off Oct 2024 | 2454 Fulton St | unit #102: replace one window at light well (not in-kind material) and fix the stucco around that window. not visible from street. same size, location, operation.Details
unit #102: replace one window at light well (not in-kind material) and fix the stucco around that window. not visible from street. same size, location, operation. | $1,500 |
| Jul 7, 2023 | Completed final sign-off Jul 2023 | 158 Edinburgh St | revision permit to document correction from 2-stories to 3-stories @ rear part of bldg on approved plans pa# 202109309601, 202205063707 & 202111122293.Details
revision permit to document correction from 2-stories to 3-stories @ rear part of bldg on approved plans pa# 202109309601, 202205063707 & 202111122293. | |
| Dec 30, 2022 | Completed final sign-off Dec 2023 | 1388 Haight St | to comply w/abe entrance program-technical infeasibility/unreasonable hardship/ordinance 51-16; abe#202002252261, (e)physical/site constraints (2)ext stairs @ entry prohibit modification not allowing for addition of elements; new power door operator install @(e)entrance to supplement (e)conditonDetails
to comply w/abe entrance program-technical infeasibility/unreasonable hardship/ordinance 51-16; abe#202002252261, (e)physical/site constraints (2)ext stairs @ entry prohibit modification not allowing for addition of elements; new power door operator install @(e)entrance to supplement (e)conditon | $2,000 |
| May 24, 2022 | Completed final sign-off Jun 2023 | 158 Edinburgh St | fix dry rot & repair siding and stucco.Details
fix dry rot & repair siding and stucco. | $12,000 |
| May 6, 2022 | Completed final sign-off Jul 2023 | 158 Edinburgh St | revision to pa#202109309601 to comply to nov #202182956. interior remodel for basement, 1st floor and 2nd floor with bathroom reconfiguration. remove partition, recondfigure the layout per plan.Details
revision to pa#202109309601 to comply to nov #202182956. interior remodel for basement, 1st floor and 2nd floor with bathroom reconfiguration. remove partition, recondfigure the layout per plan. | $12,000 |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 158 Edinburgh St | replace vinyl windows: 3 at master bedroom, 1 guest bedroom, 1 kitchen, 1 at each bathroom. 3 at basement level. replace wood clad windows for bay windows at 1 bedroom window. 2 windows street facing.Details
replace vinyl windows: 3 at master bedroom, 1 guest bedroom, 1 kitchen, 1 at each bathroom. 3 at basement level. replace wood clad windows for bay windows at 1 bedroom window. 2 windows street facing. | $15,000 |
| Nov 12, 2021 | Completed final sign-off Jul 2023 | 158 Edinburgh St | admin permit to pay fees and fine on nov #202132956. refer to pa#202109309601 for scope of work.Details
admin permit to pay fees and fine on nov #202132956. refer to pa#202109309601 for scope of work. | |
| Sep 30, 2021 | Completed final sign-off Jul 2023 | 158 Edinburgh St | construct family room & bathroom at basement level. legalize bedroom, bathroom, media room, & kitchenette at g/f. relocate kitchen, remodel (e) bathroom, add 1 full bath, & replace (e) sheetrock w/ new at 2nd floor.Details
construct family room & bathroom at basement level. legalize bedroom, bathroom, media room, & kitchenette at g/f. relocate kitchen, remodel (e) bathroom, add 1 full bath, & replace (e) sheetrock w/ new at 2nd floor. | $120,000 |
| Feb 2, 2021 | Completed final sign-off Jul 2024 | 1838 41st Av | legalization of unit: 1 bedroom, 1 bathroom, 1 kitchen.Details
legalization of unit: 1 bedroom, 1 bathroom, 1 kitchen. | $40,000 |