Back to bathroom remodel contractors
Morton Jones Construction
- Based in
- Burlingame
- On San Francisco permits
- Mar 2002 to Jun 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2021 | Completed final sign-off Jan 2022 | 191 Melrose Av | remodel of (e) family room and bathroom. upgrade lighting electrical and plumbing where required. new insulation, new sheetrock, new tile, new paint, new fan in bath. replace with 5/8 type x 5d cooler nals at 4" on center.Details
remodel of (e) family room and bathroom. upgrade lighting electrical and plumbing where required. new insulation, new sheetrock, new tile, new paint, new fan in bath. replace with 5/8 type x 5d cooler nals at 4" on center. | $36,500 |
| May 1, 2015 | Completed final sign-off Jan 2016 | 65 Aptos Av | remove & replace existn 3 bathrooms & remove & replace existing kitchen, upgrade plumbing & electrical outlets thruout home. insulate sheetrock, install cabinets, tile, paint. all work in-kind, lighting to comply with cec 150 (k).Details
remove & replace existn 3 bathrooms & remove & replace existing kitchen, upgrade plumbing & electrical outlets thruout home. insulate sheetrock, install cabinets, tile, paint. all work in-kind, lighting to comply with cec 150 (k). | $85,000 |
| Jul 29, 2003 | Completed final sign-off Jan 2004 | 801 43rd Av | remodle of existing master bedroom bathroom and bathroomDetails
remodle of existing master bedroom bathroom and bathroom | $25,000 |