Morton Jones Construction
- Based in
- Burlingame
- On San Francisco permits
- Mar 2002 to Jun 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2021 | Completed final sign-off Jan 2022 | 191 Melrose Av | remodel of (e) family room and bathroom. upgrade lighting electrical and plumbing where required. new insulation, new sheetrock, new tile, new paint, new fan in bath. replace with 5/8 type x 5d cooler nals at 4" on center.Details
remodel of (e) family room and bathroom. upgrade lighting electrical and plumbing where required. new insulation, new sheetrock, new tile, new paint, new fan in bath. replace with 5/8 type x 5d cooler nals at 4" on center. | $36,500 |
| Mar 16, 2017 | Completed final sign-off Jun 2018 | 65 Aptos Av | replace dryrot in front porch and steps. replace with new pt framing where re and new hot mop membraine and retile area. 300sf approx. less than 50%. remove all tile and rpelace with same terra cotta type.Details
replace dryrot in front porch and steps. replace with new pt framing where re and new hot mop membraine and retile area. 300sf approx. less than 50%. remove all tile and rpelace with same terra cotta type. | $20,000 |
| May 1, 2015 | Completed final sign-off Jan 2016 | 65 Aptos Av | remove & replace existn 3 bathrooms & remove & replace existing kitchen, upgrade plumbing & electrical outlets thruout home. insulate sheetrock, install cabinets, tile, paint. all work in-kind, lighting to comply with cec 150 (k).Details
remove & replace existn 3 bathrooms & remove & replace existing kitchen, upgrade plumbing & electrical outlets thruout home. insulate sheetrock, install cabinets, tile, paint. all work in-kind, lighting to comply with cec 150 (k). | $85,000 |
| Jul 29, 2003 | Completed final sign-off Jan 2004 | 801 43rd Av | remodle of existing master bedroom bathroom and bathroomDetails
remodle of existing master bedroom bathroom and bathroom | $25,000 |
| Mar 5, 2002 | Completed final sign-off May 2002 | 801 43rd Av | remove and replace exist kitchen to studs, upgrade plumbing&electrical to city codes on 2nd floor.Details
remove and replace exist kitchen to studs, upgrade plumbing&electrical to city codes on 2nd floor. | $35,000 |