Morena Llc /Dba: Tony's Windows & Glass
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2025
- Last 24 months
- 2 permits filed
171 permits since 2000: 141 completed, 1 in progress, 12 never finaled, 17 expired or cancelled.
Of the 12 never-finaled permits, 1 is 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2014 | Completed final sign-off Nov 2015 | 2640 Green St | 2 (two) stairway landings: remove windows and replace with same cocnfiguration upgrade tempered glazed double hung replacement sash and frame assembly. not seen from street. u-value more or less 0.4Details
2 (two) stairway landings: remove windows and replace with same cocnfiguration upgrade tempered glazed double hung replacement sash and frame assembly. not seen from street. u-value more or less 0.4 | $1,397 |
| Apr 21, 2008 | Completed final sign-off Sep 2008 | 118 Saturn St | front of edifice: living room / dining room / bedroom no# 1 & # 2. replace the 9e) vinyl windows with upgrade vinyl stacked casement & picture windows. rear edifice: stairway landing / bath no# 1 & # 2. kitchen. replace (e) vinyl windows with upgraded vinyl casement windows. total of 9 openings.Details
front of edifice: living room / dining room / bedroom no# 1 & # 2. replace the 9e) vinyl windows with upgrade vinyl stacked casement & picture windows. rear edifice: stairway landing / bath no# 1 & # 2. kitchen. replace (e) vinyl windows with upgraded vinyl casement windows. total of 9 openings. | $10,246 |
| Aug 31, 2006 | Completed final sign-off Jan 2007 | 3264 20th St | remove (e) sash, replace w/ new wooden upgraded sash. dbl hung. retrofit & repair openings as needed. livng rm: 3 windows, bedrm : 3 windows, parlor: 1 window, bath: 1 window, bedrm: 2 windows, kitchen: 1 window, pantry 1 window, stairway: 1 window, six of the windows in front of bldng. u max . 55Details
remove (e) sash, replace w/ new wooden upgraded sash. dbl hung. retrofit & repair openings as needed. livng rm: 3 windows, bedrm : 3 windows, parlor: 1 window, bath: 1 window, bedrm: 2 windows, kitchen: 1 window, pantry 1 window, stairway: 1 window, six of the windows in front of bldng. u max . 55 | $19,784 |
| Jun 26, 2006 | Completed final sign-off Aug 2006 | 19 Jordan Av | replace existing wooden sash within the existing openings with upgraded sash/same in kind configuration. bedroom, 3 openings. bath 1 opening, guest wash room, 1 opening. guest bedroom, 2 openings, guest bath, 1 opening. office, 6 openings. stairway landing, 2 openings & pair casements.Details
replace existing wooden sash within the existing openings with upgraded sash/same in kind configuration. bedroom, 3 openings. bath 1 opening, guest wash room, 1 opening. guest bedroom, 2 openings, guest bath, 1 opening. office, 6 openings. stairway landing, 2 openings & pair casements. | $19,784 |
| May 4, 2006 | Completed final sign-off Jun 2006 | 1249 28th Av | stairway landing-replace 1 wooden awning sash. basement toilet, replace 1 sash min ufactor 0.67.Details
stairway landing-replace 1 wooden awning sash. basement toilet, replace 1 sash min ufactor 0.67. | $375 |