Permit GraphShortlistSan Francisco building permits since 2000

Morena Llc /Dba: Tony's Windows & Glass

Contractor license
352757
State license record
Based in
San Francisco
On San Francisco permits
Jan 2000 to Feb 2025
Last 24 months
1 permit filed

171 permits since 2000: 141 completed, 1 in progress, 12 never finaled, 17 expired or cancelled.

Of the 12 never-finaled permits, 1 is 5 to 10 years old, 11 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllDeck 1Stairs 5Kitchen remodel 25Bathroom remodel 25

5 stairs permits: 5 completed. Typically 0 days from filing to permit and 130 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 17, 2014Completed
final sign-off Nov 2015
2640 Green St2 (two) stairway landings: remove windows and replace with same cocnfiguration upgrade tempered glazed double hung replacement sash and frame assembly. not seen from street. u-value more or less 0.4
Details
Permit
201404173462
Permit issued
Apr 17, 2014
Final sign-off
Nov 23, 2015

2 (two) stairway landings: remove windows and replace with same cocnfiguration upgrade tempered glazed double hung replacement sash and frame assembly. not seen from street. u-value more or less 0.4

Open the permit page

$1,397
Apr 21, 2008Completed
final sign-off Sep 2008
118 Saturn Stfront of edifice: living room / dining room / bedroom no# 1 & # 2. replace the 9e) vinyl windows with upgrade vinyl stacked casement & picture windows. rear edifice: stairway landing / bath no# 1 & # 2. kitchen. replace (e) vinyl windows with upgraded vinyl casement windows. total of 9 openings.
Details
Permit
200804210218
Permit issued
Apr 21, 2008
Final sign-off
Sep 30, 2008

front of edifice: living room / dining room / bedroom no# 1 & # 2. replace the 9e) vinyl windows with upgrade vinyl stacked casement & picture windows. rear edifice: stairway landing / bath no# 1 & # 2. kitchen. replace (e) vinyl windows with upgraded vinyl casement windows. total of 9 openings.

Open the permit page

$10,246
Aug 31, 2006Completed
final sign-off Jan 2007
3264 20th Stremove (e) sash, replace w/ new wooden upgraded sash. dbl hung. retrofit & repair openings as needed. livng rm: 3 windows, bedrm : 3 windows, parlor: 1 window, bath: 1 window, bedrm: 2 windows, kitchen: 1 window, pantry 1 window, stairway: 1 window, six of the windows in front of bldng. u max . 55
Details
Permit
200608311175
Permit issued
Aug 31, 2006
Final sign-off
Jan 8, 2007

remove (e) sash, replace w/ new wooden upgraded sash. dbl hung. retrofit & repair openings as needed. livng rm: 3 windows, bedrm : 3 windows, parlor: 1 window, bath: 1 window, bedrm: 2 windows, kitchen: 1 window, pantry 1 window, stairway: 1 window, six of the windows in front of bldng. u max . 55

Open the permit page

$19,784
Jun 26, 2006Completed
final sign-off Aug 2006
19 Jordan Avreplace existing wooden sash within the existing openings with upgraded sash/same in kind configuration. bedroom, 3 openings. bath 1 opening, guest wash room, 1 opening. guest bedroom, 2 openings, guest bath, 1 opening. office, 6 openings. stairway landing, 2 openings & pair casements.
Details
Permit
200606265053
Permit issued
Jun 26, 2006
Final sign-off
Aug 3, 2006

replace existing wooden sash within the existing openings with upgraded sash/same in kind configuration. bedroom, 3 openings. bath 1 opening, guest wash room, 1 opening. guest bedroom, 2 openings, guest bath, 1 opening. office, 6 openings. stairway landing, 2 openings & pair casements.

Open the permit page

$19,784
May 4, 2006Completed
final sign-off Jun 2006
1249 28th Avstairway landing-replace 1 wooden awning sash. basement toilet, replace 1 sash min ufactor 0.67.
Details
Permit
200605040747
Permit issued
May 4, 2006
Final sign-off
Jun 7, 2006

stairway landing-replace 1 wooden awning sash. basement toilet, replace 1 sash min ufactor 0.67.

Open the permit page

$375