Momentum Construction & Development Llc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2024 to Nov 2026
- Last 24 months
- 6 permits filed
8 permits since 2000: 7 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Stairs permits
2 stairs permits: 1 completed, 1 in progress. Typically 78 days from filing to permit and 380 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 1821 21st Av | front stair replacement: reconstruction (e) damaged front staircase in kind w/ timber framing, maintain (e) location, configuration, overall dimensions, riser/tread arrangement, and finished elevations. provide new stone exterior stone tile finish similar to (e) in general appearance...Details
front stair replacement: reconstruction (e) damaged front staircase in kind w/ timber framing, maintain (e) location, configuration, overall dimensions, riser/tread arrangement, and finished elevations. provide new stone exterior stone tile finish similar to (e) in general appearance... | $15,000 |
| Aug 5, 2024 | Completed final sign-off Nov 2025 | 2359 26th Av | relocate washer and dryer and water heater; construct and enclose to seperate garage and stair; combine sunroom and bedroom into 2 master suite; relocate internal stair and enlarge kitchen by infilling light well.Details
relocate washer and dryer and water heater; construct and enclose to seperate garage and stair; combine sunroom and bedroom into 2 master suite; relocate internal stair and enlarge kitchen by infilling light well. | $50,000 |