Module Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Dec 2019
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 4 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2015 | Completed final sign-off Apr 2016 | 2023 43rd Av | at garage level (1st floor) - construct new walls for new bath & playroom, legalize (e) family room & (e) full bathroom. at 2nd floor - new bathroom & deck with stair. all work per plans.Details
at garage level (1st floor) - construct new walls for new bath & playroom, legalize (e) family room & (e) full bathroom. at 2nd floor - new bathroom & deck with stair. all work per plans. | $30,000 |
| Apr 17, 2015 | Completed final sign-off Jun 2015 | 1926 42nd Av | add a new deck at rear of (e) bldDetails
add a new deck at rear of (e) bld | $5,000 |
| May 13, 2014 | Completed final sign-off Mar 2015 | 821 Peru Av | add 1 master bedroom and bath on the 1st fl. apprx 262 sf. add spiral stair to connect 1st fl to basement. add 152 sf rear deck and stair, replace 2 front windows on 2/f with wood-clad in same size & slider on both sides in kind, 5 windows at rear, replace garage door.Details
add 1 master bedroom and bath on the 1st fl. apprx 262 sf. add spiral stair to connect 1st fl to basement. add 152 sf rear deck and stair, replace 2 front windows on 2/f with wood-clad in same size & slider on both sides in kind, 5 windows at rear, replace garage door. | $35,000 |
| Oct 17, 2012 | Completed final sign-off Mar 2013 | 434 Hearst Av | fill in 150 sq ft on 1st fl. add a (n) exterior deck & relocate (e) exterior stair convert part of garage to 382 sq ft of habitable space including a (n) family rm, bedrm & bathrm on 1st fl remodeling, 2nd fl & replace window. kitchen & bath remodeling under permit #2012-0914-9829 except electricDetails
fill in 150 sq ft on 1st fl. add a (n) exterior deck & relocate (e) exterior stair convert part of garage to 382 sq ft of habitable space including a (n) family rm, bedrm & bathrm on 1st fl remodeling, 2nd fl & replace window. kitchen & bath remodeling under permit #2012-0914-9829 except electric | $30,000 |
| May 2, 2006 | Never finaled issued Mar 2007, no final | 667 41st Av | res' alterations & addition, level 1: demo extg illegal res' unit demo&replace selected foundations&slabs,add new foundation, slabs& structural frames.build new hall, bath utility &recreation room. level 2: remove extg rear bedroom, build new bedroom,deck, spiral stair & master br ext.remove storagDetails
res' alterations & addition, level 1: demo extg illegal res' unit demo&replace selected foundations&slabs,add new foundation, slabs& structural frames.build new hall, bath utility &recreation room. level 2: remove extg rear bedroom, build new bedroom,deck, spiral stair & master br ext.remove storag | $180,000 |