Back to bathroom remodel contractors
Module Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Dec 2019
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 26 completed, 2 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2019 | Completed final sign-off Dec 2021 | 18 Flood Av | interior remodel: add a new bedroom & new full bathroom at ground floor, relocate (e) kitchen, remodel bath & add new bedroom at 2nd fl.Details
interior remodel: add a new bedroom & new full bathroom at ground floor, relocate (e) kitchen, remodel bath & add new bedroom at 2nd fl. | $80,000 |
| Apr 4, 2019 | Completed final sign-off Sep 2019 | 75 Montana St | interior remodel: add new bedroom and full bathroom at 1st floor.Details
interior remodel: add new bedroom and full bathroom at 1st floor. | $40,000 |
| Aug 26, 2016 | Expired or cancelled cancelled Nov 2016 | 375 Prentiss St | remodel bathroom on 2/fDetails
remodel bathroom on 2/f | $7,000 |
| Aug 16, 2016 | Completed final sign-off May 2017 | 1555 23rd Av | alteration extg bath room and add 1 bathroom at 2nd floor.Details
alteration extg bath room and add 1 bathroom at 2nd floor. | $20,000 |
| Mar 4, 2016 | Completed final sign-off Jul 2017 | 1370 28th Av | 1/f conversion to 2 bedrooms, 1 full, one 1/2 bath, laundry room & family room. 2/f remodel kitchen, bathroom, replace (5) windows, upgrade electrical, plumbing & mechanical, strengthening foundation & repair slab floor, replace rear stair/guardrail @ rear.Details
1/f conversion to 2 bedrooms, 1 full, one 1/2 bath, laundry room & family room. 2/f remodel kitchen, bathroom, replace (5) windows, upgrade electrical, plumbing & mechanical, strengthening foundation & repair slab floor, replace rear stair/guardrail @ rear. | $100,000 |
| Jul 14, 2015 | Completed final sign-off Apr 2016 | 2023 43rd Av | at garage level (1st floor) - construct new walls for new bath & playroom, legalize (e) family room & (e) full bathroom. at 2nd floor - new bathroom & deck with stair. all work per plans.Details
at garage level (1st floor) - construct new walls for new bath & playroom, legalize (e) family room & (e) full bathroom. at 2nd floor - new bathroom & deck with stair. all work per plans. | $30,000 |
| May 14, 2015 | Completed final sign-off Jun 2017 | 1555 23rd Av | unit legalization per ordinance no# 43-14. one bedroom, living room, one kitchen & one bathroom @ 1st floor.Details
unit legalization per ordinance no# 43-14. one bedroom, living room, one kitchen & one bathroom @ 1st floor. | $38,000 |
| Feb 17, 2015 | Completed final sign-off Jun 2015 | 1926 42nd Av | interior remodeling: add new bathroom, relocate existing bath at 2nd floorDetails
interior remodeling: add new bathroom, relocate existing bath at 2nd floor | $15,000 |
| May 28, 2014 | Completed final sign-off Mar 2015 | 130 Everson St | remodeling kitchen and bathroom, replace in kind. no structural work. replace in kind 6 windowsDetails
remodeling kitchen and bathroom, replace in kind. no structural work. replace in kind 6 windows | $35,000 |
| May 13, 2014 | Completed final sign-off Mar 2015 | 821 Peru Av | add 1 master bedroom and bath on the 1st fl. apprx 262 sf. add spiral stair to connect 1st fl to basement. add 152 sf rear deck and stair, replace 2 front windows on 2/f with wood-clad in same size & slider on both sides in kind, 5 windows at rear, replace garage door.Details
add 1 master bedroom and bath on the 1st fl. apprx 262 sf. add spiral stair to connect 1st fl to basement. add 152 sf rear deck and stair, replace 2 front windows on 2/f with wood-clad in same size & slider on both sides in kind, 5 windows at rear, replace garage door. | $35,000 |
| Mar 13, 2014 | Completed final sign-off Mar 2015 | 821 Peru Av | remodel existing kitchen & bath on 2/f. replace all plumbing fixures, countertop cabinets.Details
remodel existing kitchen & bath on 2/f. replace all plumbing fixures, countertop cabinets. | $12,000 |
| Apr 12, 2013 | Completed final sign-off Jun 2016 | 1024 Persia Av | 1. add new family room, bedroom and bathroom at ground floor. 2. add a new stairway at the rear of (e) building.Details
1. add new family room, bedroom and bathroom at ground floor. 2. add a new stairway at the rear of (e) building. | $30,000 |
| Oct 17, 2012 | Completed final sign-off Mar 2013 | 434 Hearst Av | fill in 150 sq ft on 1st fl. add a (n) exterior deck & relocate (e) exterior stair convert part of garage to 382 sq ft of habitable space including a (n) family rm, bedrm & bathrm on 1st fl remodeling, 2nd fl & replace window. kitchen & bath remodeling under permit #2012-0914-9829 except electricDetails
fill in 150 sq ft on 1st fl. add a (n) exterior deck & relocate (e) exterior stair convert part of garage to 382 sq ft of habitable space including a (n) family rm, bedrm & bathrm on 1st fl remodeling, 2nd fl & replace window. kitchen & bath remodeling under permit #2012-0914-9829 except electric | $30,000 |
| Sep 14, 2012 | Completed final sign-off Mar 2013 | 434 Hearst Av | remodel (e) kitchen & bathroom, replace all plumbing fixtures, counter top & cabinetsDetails
remodel (e) kitchen & bathroom, replace all plumbing fixtures, counter top & cabinets | $12,000 |
| Aug 9, 2012 | Never finaled issued Aug 2012, no final | 246 27th Av | ground floor: interior remodel: adding a 9n) half bath & convert (e) room to (n) storage at ground floor as per plan.Details
ground floor: interior remodel: adding a 9n) half bath & convert (e) room to (n) storage at ground floor as per plan. | $5,000 |
| Feb 19, 2009 | Completed final sign-off Jun 2009 | 354 Leland Av | 1st floor-add new powder room & convert (e) storage to playroom, 2nd floor-add new laundry room, remodel (e) bathroom & kitchen, new front concrete steps on grade, repair (e) drivewayDetails
1st floor-add new powder room & convert (e) storage to playroom, 2nd floor-add new laundry room, remodel (e) bathroom & kitchen, new front concrete steps on grade, repair (e) driveway | $50,000 |
| Apr 4, 2008 | Completed final sign-off Aug 2008 | 1709 11th Av | interior work only-add a master bedroom with bathroom on 1st fl (total additional habitable space is 321 sf). remove non-bearing partition wall by kitchen on 2nd floor. upgrade all windows except front window to double pane windows & match (e). total of (7).Details
interior work only-add a master bedroom with bathroom on 1st fl (total additional habitable space is 321 sf). remove non-bearing partition wall by kitchen on 2nd floor. upgrade all windows except front window to double pane windows & match (e). total of (7). | $30,000 |
| Apr 1, 2008 | Completed final sign-off Aug 2008 | 1709 11th Av | remodel existing bathroom and kitchen in 2nd fl. replace cabinet, countertop, tub, toilet, tile, flooring, light fixtures added. new receiptacle in bedrooms.Details
remodel existing bathroom and kitchen in 2nd fl. replace cabinet, countertop, tub, toilet, tile, flooring, light fixtures added. new receiptacle in bedrooms. | $20,000 |
| Jan 22, 2008 | Completed final sign-off Mar 2008 | 75 Montana St | remodel (e) kitchen & bathroom on 2nd floor. upgrage electrical system. replace garage door in kind match to neighbor. replace kitchen cabients, toilet, bathtub, vanity sink, tile flooring. provide 200 sq. inch ventilation in garage door.Details
remodel (e) kitchen & bathroom on 2nd floor. upgrage electrical system. replace garage door in kind match to neighbor. replace kitchen cabients, toilet, bathtub, vanity sink, tile flooring. provide 200 sq. inch ventilation in garage door. | $15,000 |
| Oct 29, 2007 | Completed final sign-off Mar 2008 | 369 Prospect Av | remodel kitchens & bathrooms included new countertop, cabinet, applicances, flooring, plumbing, electrical, lighting, repalce waterheater, furnacesDetails
remodel kitchens & bathrooms included new countertop, cabinet, applicances, flooring, plumbing, electrical, lighting, repalce waterheater, furnaces | $100,000 |
| Oct 19, 2007 | Completed final sign-off Mar 2008 | 52 Ceres St | revision to pa# 2007/02/09/3820. delete the kitchen & bathroom remodel work at 2nd floor. replace all (e) plastic waste line with cast iron pipe in basement floor.Details
revision to pa# 2007/02/09/3820. delete the kitchen & bathroom remodel work at 2nd floor. replace all (e) plastic waste line with cast iron pipe in basement floor. | |
| Feb 9, 2007 | Completed final sign-off Mar 2008 | 52 Ceres St | remodel e kitchen and bath at 2nd floor. remove and replace 7 windows at 2nd floor to match existing. install new central furnace system. upgrade e electrical services. windows not visible streetDetails
remodel e kitchen and bath at 2nd floor. remove and replace 7 windows at 2nd floor to match existing. install new central furnace system. upgrade e electrical services. windows not visible street | $35,000 |
| Aug 21, 2006 | Completed final sign-off Dec 2006 | 1746 Wawona St | remodel (e) 2nd floor kitchen and two bath rooms no structural work. new lighting.Details
remodel (e) 2nd floor kitchen and two bath rooms no structural work. new lighting. | $26,000 |
| Jul 3, 2006 | Completed final sign-off Nov 2006 | 429 Moraga St | remodel (e) bathroom only. bamgolow house.Details
remodel (e) bathroom only. bamgolow house. | $5,500 |
| Jun 29, 2006 | Completed final sign-off Aug 2006 | 160 Caine Av | add one powder room in family room on 1/f & to add 1 new bathroom on 2/fDetails
add one powder room in family room on 1/f & to add 1 new bathroom on 2/f | $9,000 |
| Jun 14, 2006 | Completed final sign-off Aug 2006 | 160 Caine Av | remodel 1 (e) kitchen & 2 (e) bathroom on 2nd floor & remodel (e) bathroom on 1st floor.Details
remodel 1 (e) kitchen & 2 (e) bathroom on 2nd floor & remodel (e) bathroom on 1st floor. | $10,000 |
| Jun 14, 2006 | Completed final sign-off Dec 2006 | 1746 Wawona St | add a new bedroom, bathroom & powder room, relocate (e) family room on 1/f. no work on 2/f & interior work only. add a new bedroom, bathroom & powder room & relocate (e) family room on 1/f. no work on 2/f & interior work only.Details
add a new bedroom, bathroom & powder room, relocate (e) family room on 1/f. no work on 2/f & interior work only. add a new bedroom, bathroom & powder room & relocate (e) family room on 1/f. no work on 2/f & interior work only. | $28,000 |
| May 2, 2006 | Never finaled issued Mar 2007, no final | 667 41st Av | res' alterations & addition, level 1: demo extg illegal res' unit demo&replace selected foundations&slabs,add new foundation, slabs& structural frames.build new hall, bath utility &recreation room. level 2: remove extg rear bedroom, build new bedroom,deck, spiral stair & master br ext.remove storagDetails
res' alterations & addition, level 1: demo extg illegal res' unit demo&replace selected foundations&slabs,add new foundation, slabs& structural frames.build new hall, bath utility &recreation room. level 2: remove extg rear bedroom, build new bedroom,deck, spiral stair & master br ext.remove storag | $180,000 |
| Dec 29, 2005 | Completed final sign-off May 2006 | 1646 11th Av | add a new bedroom, bath, & playroom on 1st floor, remodel (e) kitchen & bath & remove 1 non-bearing wall on 2nd floor & add 1 new bathroom on 2nd floor.Details
add a new bedroom, bath, & playroom on 1st floor, remodel (e) kitchen & bath & remove 1 non-bearing wall on 2nd floor & add 1 new bathroom on 2nd floor. | $45,000 |