Modern Design Construction
- Based in
- Morgan Hill
- On San Francisco permits
- Mar 2019 to Mar 2019
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 271 days from filing to permit and 2117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2019 | Completed final sign-off Oct 2025 | 468 18th Av | 3/f: reconfigure (e) floor layout: covert (e) 2 bedroom apt to a 3 bedroom: relocate kitchen, covert (e) kitchen to bedroom. new non-loading partitions. add 2 full bathroom. infill rear windows. no exterior work visible from street.Details
3/f: reconfigure (e) floor layout: covert (e) 2 bedroom apt to a 3 bedroom: relocate kitchen, covert (e) kitchen to bedroom. new non-loading partitions. add 2 full bathroom. infill rear windows. no exterior work visible from street. | $30,000 |