Back to kitchen remodel contractors
Mj Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Nov 2013
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 10 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2009 | Completed final sign-off Apr 2009 | 3525 16th St | work in unit #3525 16th street-comply with physical inspection report #cc5437-legalize full bathroom, partition walls & doors on ground floor. demo kitchen. install exhaust fan, dimmer switches & flourscent lighting bathroom on ground floor, legalize 2 storage room on g/f.Details
work in unit #3525 16th street-comply with physical inspection report #cc5437-legalize full bathroom, partition walls & doors on ground floor. demo kitchen. install exhaust fan, dimmer switches & flourscent lighting bathroom on ground floor, legalize 2 storage room on g/f. | $1,000 |
| Mar 5, 2007 | Completed final sign-off Jun 2007 | 874 41st Av | remodel (e) kitchen with (n) fixtures, cabinets, lighting and finishes.r eplace 1 window in light well.Details
remodel (e) kitchen with (n) fixtures, cabinets, lighting and finishes.r eplace 1 window in light well. | $12,000 |
| Mar 5, 2007 | Completed final sign-off May 2008 | 62 Havelock St | real addition for family room, kitchen, breakfast and master bedroom.Details
real addition for family room, kitchen, breakfast and master bedroom. | $120,000 |
| Feb 5, 2007 | Completed final sign-off May 2007 | 26 Dearborn St | remove door from kitchen to bedroom and 2x studs & sheetrock opening in. per plan.Details
remove door from kitchen to bedroom and 2x studs & sheetrock opening in. per plan. | $300 |