Back to kitchen remodel contractors
Missud Contracting Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Feb 2010
- Last 24 months
- 0 permits filed
19 permits since 2000: 11 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2005 | Expired or cancelled expired Apr 2007 | 438 Campbell Av | remodel both units including 2 kitchens, 2 baths, 20 wooden windows, drywall, update electric & heating, new paint & flooring. widen (e) front driveway to allow for 20% front yard landscaping. roof deck removed.Details
remodel both units including 2 kitchens, 2 baths, 20 wooden windows, drywall, update electric & heating, new paint & flooring. widen (e) front driveway to allow for 20% front yard landscaping. roof deck removed. | $60,000 |
| Sep 3, 2002 | Completed final sign-off Dec 2002 | 136 Guerrero St | convert galvanized to copper,add new elec. circuits,cabinets &plumbing fixtures.remodel kitchen&bathDetails
convert galvanized to copper,add new elec. circuits,cabinets &plumbing fixtures.remodel kitchen&bath | $10,000 |
| Sep 3, 2002 | Completed final sign-off Dec 2002 | 136 Guerrero St | convert galvanized to copper,add new elec. circuits,cabinets &plumbing fixtures.remodel kitchen&bathDetails
convert galvanized to copper,add new elec. circuits,cabinets &plumbing fixtures.remodel kitchen&bath | $10,000 |
| Dec 20, 2001 | Completed final sign-off May 2002 | 136 Guerrero St | remodel kitchen cabinet and fixtures/recopper and run additional ele. circutsDetails
remodel kitchen cabinet and fixtures/recopper and run additional ele. circuts | $10,000 |
| Aug 23, 2001 | Completed final sign-off Feb 2002 | 136 Guerrero St | bath & kitchen remodel (replace cabs & fixtures) recopper & run additional, circuits, electricalDetails
bath & kitchen remodel (replace cabs & fixtures) recopper & run additional, circuits, electrical | $10,000 |
| Oct 30, 2000 | Completed final sign-off Feb 2001 | 136 Guerrero St | recopper galvanized supple @ kitchen & bath,replace knob & tube,add insulation,replace w/sheetrockDetails
recopper galvanized supple @ kitchen & bath,replace knob & tube,add insulation,replace w/sheetrock | $5,500 |