Mission Home Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2020 to Oct 2026
- Last 24 months
- 108 permits filed
218 permits since 2000: 141 completed, 48 in progress, 7 never finaled, 22 expired or cancelled.
Of the 7 never-finaled permits, 7 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
25 stairs permits: 13 completed, 6 in progress, 3 never finaled, 3 expired or cancelled. Typically 53 days from filing to permit and 468 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 904 Steiner St | stairs remodel at front of the house and addition of handrail according to the plan. remove (e) front landing, steps and provide new p.t. wood framing with redwood decking on stairs and landing.Details
stairs remodel at front of the house and addition of handrail according to the plan. remove (e) front landing, steps and provide new p.t. wood framing with redwood decking on stairs and landing. | $20,000 |
| Nov 10, 2025 | Completed final sign-off Jul 2026 | 1936 Grove St | 3/f: remove 0.25 bath. relocate existing laundry room. reconfigure existing hall with half bath to full bathroom. create new hallway thru kitchen for access to existing stairs. create a new primary bathroom. remodel existing kitchen. no exterior work.Details
3/f: remove 0.25 bath. relocate existing laundry room. reconfigure existing hall with half bath to full bathroom. create new hallway thru kitchen for access to existing stairs. create a new primary bathroom. remodel existing kitchen. no exterior work. | $70,000 |
| Aug 26, 2025 | In progress issued Dec 2025 | 2454 22nd Av | interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setbackDetails
interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setback | $80,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 77 Rico Wy | 1st fl: remove storage, stairs, portion of ex garage, bedroom closet & hall bathroom, exercise room hall & closet: create new hall, laundry & closet, bathroom, wic & family room. remove ex rooom: create (n) bathroom. provide (n) 100 amp subpanel. 2nd fl: remove br, hall, kitchen, laundry, stairsDetails
1st fl: remove storage, stairs, portion of ex garage, bedroom closet & hall bathroom, exercise room hall & closet: create new hall, laundry & closet, bathroom, wic & family room. remove ex rooom: create (n) bathroom. provide (n) 100 amp subpanel. 2nd fl: remove br, hall, kitchen, laundry, stairs | $250,000 |
| Jul 17, 2025 | Completed final sign-off Dec 2025 | 639 45th Av | front door stairway: remove and replace the stair and landing assembly per plan. provide new footing per plan.Details
front door stairway: remove and replace the stair and landing assembly per plan. provide new footing per plan. | $42,000 |
| May 15, 2025 | Completed final sign-off Jun 2026 | 1794 Page St | exterior siding & trim/ front porch addition. demo stucco, mansards, stairs construct wood porch & stair. new french door & 2 windows. install siding and historic trim. new windowsDetails
exterior siding & trim/ front porch addition. demo stucco, mansards, stairs construct wood porch & stair. new french door & 2 windows. install siding and historic trim. new windows | $200,000 |
| Jan 14, 2025 | Expired or cancelled expired Feb 2026 | 583 Mangels Av | revision remove existing concrete area and rear stairs and provide new stairs and concrete slab revision to 2023-1122-1308Details
revision remove existing concrete area and rear stairs and provide new stairs and concrete slab revision to 2023-1122-1308 | |
| Sep 13, 2024 | Expired or cancelled expired Feb 2026 | 428 27th St | revision to pa # 201909060896: mirror kitchen & stair location. remove breezeway. shift rear windows and glass doors.Details
revision to pa # 201909060896: mirror kitchen & stair location. remove breezeway. shift rear windows and glass doors. | $5,000 |
| Jun 6, 2024 | Completed final sign-off Jun 2026 | 1967 09th Av | interior remodel: reconfigure garage (1st fl) convert portition of garage into a (n) bedroom, media room, bathroom, closet, vestibule area, storage. replace (e) stairs. 2nd fl: turn storage into laundry area reconfigure closet & bathroom. create new closetDetails
interior remodel: reconfigure garage (1st fl) convert portition of garage into a (n) bedroom, media room, bathroom, closet, vestibule area, storage. replace (e) stairs. 2nd fl: turn storage into laundry area reconfigure closet & bathroom. create new closet | $200,000 |
| May 10, 2024 | In progress issued Oct 2024 | 1883 Funston Av | alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard.Details
alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard. | $100,000 |
| Feb 23, 2024 | In progress issued Mar 2024 | 38 Belcher St | remove some portion of existing ceiling; provide new stairs and under stairs storage; remove some portion of existing roof create new roof hatch and roof deckDetails
remove some portion of existing ceiling; provide new stairs and under stairs storage; remove some portion of existing roof create new roof hatch and roof deck | $100,000 |
| Nov 22, 2023 | Completed final sign-off Feb 2026 | 583 Mangels Av | 1/f: remove (e)garage & bathrm, create new garage, laundry rm, vestibule, bedrm, bathrm, walk-in closet, new utility area; remove (e)stairs, install new prefab spiral stairs; 2/f: remove (e)kitchen/dining room, closet, create new kitchen & closet for (e) bedroom. remodel (e) bathroom. new skylight.Details
1/f: remove (e)garage & bathrm, create new garage, laundry rm, vestibule, bedrm, bathrm, walk-in closet, new utility area; remove (e)stairs, install new prefab spiral stairs; 2/f: remove (e)kitchen/dining room, closet, create new kitchen & closet for (e) bedroom. remodel (e) bathroom. new skylight. | $250,000 |
| Sep 11, 2023 | In progress issued Nov 2023 | 1033 Green St | basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingDetails
basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding | $200,000 |
| Jul 19, 2023 | Never finaled issued Aug 2023, no final | 1 Santa Ysabel Av | revision to pa# 202306230703. front stair replacement. dry rot repair > 50%, replace in kindDetails
revision to pa# 202306230703. front stair replacement. dry rot repair > 50%, replace in kind | |
| Jun 23, 2023 | Never finaled issued Jun 2023, no final | 1 Santa Ysabel Av | stucco repair and staircase repair up to 50% like for like.Details
stucco repair and staircase repair up to 50% like for like. | $15,000 |
| Jun 21, 2023 | Completed final sign-off Feb 2025 | 1725 10th Av | gr fl remove (e) garage,furnace stairs.(n) garage,stairs,vestibule, storage, office, & closet. 2/f remove back laundry struct & rebuild same size. add kitchen. (n) bath & hallway. (n) water heater, furnace, skylight.3/f new deck over new kitchen. remove windows and replace tempered door.Details
gr fl remove (e) garage,furnace stairs.(n) garage,stairs,vestibule, storage, office, & closet. 2/f remove back laundry struct & rebuild same size. add kitchen. (n) bath & hallway. (n) water heater, furnace, skylight.3/f new deck over new kitchen. remove windows and replace tempered door. | $150,000 |
| May 31, 2023 | Completed final sign-off Jul 2024 | 290 Monticello St | relocate (e)washer/dryer, water heater and furnance to (e) garage. create new master bedroom and bathroom. hallway and under stairs storage in the rear (e)garage. remodel existing bathroom, remodel (e) kitchen, remove and replace (e) stairs to lower floor with new guardrail/handrail. replace (e)woodDetails
relocate (e)washer/dryer, water heater and furnance to (e) garage. create new master bedroom and bathroom. hallway and under stairs storage in the rear (e)garage. remodel existing bathroom, remodel (e) kitchen, remove and replace (e) stairs to lower floor with new guardrail/handrail. replace (e)wood | $150,000 |
| Dec 23, 2022 | Completed final sign-off May 2024 | 339 Paris St | 3rd level gut & remodel. moving walls, change format. front staircase (st facing) replace in-kind. siding replace. (st facing replace in-kind) sides of building with wood siding.Details
3rd level gut & remodel. moving walls, change format. front staircase (st facing) replace in-kind. siding replace. (st facing replace in-kind) sides of building with wood siding. | $150,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2025 | 323 25th Av | kitchen and bath remodel at 3/f. new exterior stair in light well. new wood deck at grade in rear yard, less than 36" above grade. new glass doors to rear yard at 2/f. replace existing windows at 3/f.Details
kitchen and bath remodel at 3/f. new exterior stair in light well. new wood deck at grade in rear yard, less than 36" above grade. new glass doors to rear yard at 2/f. replace existing windows at 3/f. | $100,000 |
| Nov 2, 2022 | Completed final sign-off May 2026 | 1854 Jefferson St | revision to bpa#202205244906, selective demo interior partitions, doors, stairs, windows, kitchens, & bathrooms, remodel bedrooms, 4 n bathrms, (n)stairs, kitchen layout, kitchenette, windows, balconies, 17 p.v. panels on roof/3 floor roof. new elec/hvac throughout. legalize three decks. 1 (n) deckDetails
revision to bpa#202205244906, selective demo interior partitions, doors, stairs, windows, kitchens, & bathrooms, remodel bedrooms, 4 n bathrms, (n)stairs, kitchen layout, kitchenette, windows, balconies, 17 p.v. panels on roof/3 floor roof. new elec/hvac throughout. legalize three decks. 1 (n) deck | $400,000 |
| May 24, 2022 | Expired or cancelled expired May 2026 | 1854 Jefferson St | selective demo of interior partitions & remodel of bedrooms & bathrooms, stairs, kitchen; (n) electric throughoutDetails
selective demo of interior partitions & remodel of bedrooms & bathrooms, stairs, kitchen; (n) electric throughout | $100,000 |
| Dec 1, 2021 | Completed final sign-off Apr 2023 | 1515 11th Av | addition 2 bathrooms, one laundry on 3rd floor and repair 45% exterior wood stair. 2 skylights on third fl.Details
addition 2 bathrooms, one laundry on 3rd floor and repair 45% exterior wood stair. 2 skylights on third fl. | $40,000 |
| Nov 29, 2021 | Completed final sign-off Aug 2024 | 2094 Bush St | complete (e) basement reno: remove (e) water heater and replace by indoor tankless water heater. (n) electrical ventless laundry machine, remove (e) complete bathr. replace by (n) powder room. (n) spiral staircase to connect first floor and basement, per plan, elec, mech, plumbing by codeDetails
complete (e) basement reno: remove (e) water heater and replace by indoor tankless water heater. (n) electrical ventless laundry machine, remove (e) complete bathr. replace by (n) powder room. (n) spiral staircase to connect first floor and basement, per plan, elec, mech, plumbing by code | $70,000 |
| Jul 14, 2021 | Never finaled issued Aug 2022, no final | 78 26th Av | convert 430 sf (e) attic space to habitable. (n) stair to attic. add 2 dormers, reconfig of (e). add skylight to roof. structural improvements to accomodate (n) habitable space & upgrade (e) foundations.Details
convert 430 sf (e) attic space to habitable. (n) stair to attic. add 2 dormers, reconfig of (e). add skylight to roof. structural improvements to accomodate (n) habitable space & upgrade (e) foundations. | $200,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2025 | 262 20th Av | horizontal addition to the rear to create (n) family room, expand kitchen/dining room & additional bedroom. (n) deck over 1st fl addition w/ (n) stair to rear yard. widen garage door. replace front windows w/ (n) clad wood windows to match.Details
horizontal addition to the rear to create (n) family room, expand kitchen/dining room & additional bedroom. (n) deck over 1st fl addition w/ (n) stair to rear yard. widen garage door. replace front windows w/ (n) clad wood windows to match. | $200,000 |