Back to bathroom remodel contractors
Mission Bay Construction Services Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to May 2024
- Last 24 months
- 0 permits filed
28 permits since 2000: 18 completed, 1 in progress, 9 never finaled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 4 never finaled. Typically 0 days from filing to permit and 655 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2024 | Completed final sign-off Feb 2025 | 1527 20th Av | convert existing bedroom to primary bathroom & closet. convert existing family room to bedroom. convert existing closet to laundry room. plumbing and electrical in remodeled areaDetails
convert existing bedroom to primary bathroom & closet. convert existing family room to bedroom. convert existing closet to laundry room. plumbing and electrical in remodeled area | $40,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 75 Magellan Av | remodel en suite bathroom at 3rd level. new toilet, vanity, tub, tiles. no change to layout.Details
remodel en suite bathroom at 3rd level. new toilet, vanity, tub, tiles. no change to layout. | $29,000 |
| Nov 29, 2018 | Completed final sign-off Oct 2021 | 2031 29th Av | remodel kitchen & bathroom, no change in layoutDetails
remodel kitchen & bathroom, no change in layout | $38,000 |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 1084 Howard St | unit a: replace kitchen in kind (n) cabinets, tile, sink & appliances. replace bathroom in kind (n) tile, tub, toilet, lavy fixtures. in residence only.Details
unit a: replace kitchen in kind (n) cabinets, tile, sink & appliances. replace bathroom in kind (n) tile, tub, toilet, lavy fixtures. in residence only. | $23,000 |
| May 3, 2017 | Never finaled issued May 2017, no final | 2382 Hyde St | interior remodel. remodel master bathroom & guest bathroom. create 1/2 bathroom in lower level. remodel kitchen and remove a portion of non-bearing wall in kitchen areaDetails
interior remodel. remodel master bathroom & guest bathroom. create 1/2 bathroom in lower level. remodel kitchen and remove a portion of non-bearing wall in kitchen area | $62,000 |
| Feb 14, 2017 | Completed final sign-off Jun 2019 | 431 Capp St | existing: 2 unit residential bldg: add 3rd unit at ground floor. no new walls, new kitchen, bathroom, bed room, and living space. sprinklers at ground level under seperate permit. (nfpa 13r)Details
existing: 2 unit residential bldg: add 3rd unit at ground floor. no new walls, new kitchen, bathroom, bed room, and living space. sprinklers at ground level under seperate permit. (nfpa 13r) | $40,000 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 3709 25th St | interior remodel @ 3rd fl adding one full bath. all work to be performed w/in (e) boundary of the bldg.Details
interior remodel @ 3rd fl adding one full bath. all work to be performed w/in (e) boundary of the bldg. | $11,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 3709 25th St | swap out bathroom fixtures, no change in layout, toilet, bath tub, vanity.Details
swap out bathroom fixtures, no change in layout, toilet, bath tub, vanity. | $9,000 |
| Nov 13, 2015 | Completed final sign-off Aug 2017 | 233 Stanyan St | one bath remodel @ 2nd floor - replace all bathroom fixtures in kind, new tiles, vanity, tub, shower, toilet, new gfci & led recessed lights.Details
one bath remodel @ 2nd floor - replace all bathroom fixtures in kind, new tiles, vanity, tub, shower, toilet, new gfci & led recessed lights. | $18,500 |