Back to kitchen remodel contractors
Millennium Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2008 to Sep 2021
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 4 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2021 | Completed final sign-off Jun 2022 | 826 Geneva Av | remodel gr fl to one multi use room, 2 baths and 2nd kitchen.Details
remodel gr fl to one multi use room, 2 baths and 2nd kitchen. | $50,888 |
| Jul 10, 2014 | Completed final sign-off Apr 2016 | 2371 17th Av | remodel (e) kitchen & bath, reconfigure (e) bedrooms upstairs & add to provide 3 beds/2 bath upstairs & 1 bed/1 family room/2 bath downstairs.horizontal additionDetails
remodel (e) kitchen & bath, reconfigure (e) bedrooms upstairs & add to provide 3 beds/2 bath upstairs & 1 bed/1 family room/2 bath downstairs.horizontal addition | $130,000 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 1635 33rd Av | interior remodeling: add two (n) master suite with bath at ground floor. add one new bath & kitchen remodel at 2nd. floor. build (n) decking at rear of (e) building.Details
interior remodeling: add two (n) master suite with bath at ground floor. add one new bath & kitchen remodel at 2nd. floor. build (n) decking at rear of (e) building. | $78,000 |
| Jul 19, 2011 | Completed final sign-off Sep 2011 | 195 20th Av | replace kitchen cabinets, update bathroom by repalcing tile and vanity, add 2 ceiling lights in kitchen. at least 50% high efficacy lighting (by wattage) no change to exhaust system.Details
replace kitchen cabinets, update bathroom by repalcing tile and vanity, add 2 ceiling lights in kitchen. at least 50% high efficacy lighting (by wattage) no change to exhaust system. | $4,500 |
| Apr 29, 2009 | Completed final sign-off Sep 2009 | 1494 Quesada Av | remodel existing kitchen & 2 full bathroom on 2nd flr, replace toilet, bath tub, counter top and cabinet in the kitchen. no new wall; no modification to existing walls, bathrooms and kitchen to be same size and same location, all work is non structural ; provide h.e. lights per title 24Details
remodel existing kitchen & 2 full bathroom on 2nd flr, replace toilet, bath tub, counter top and cabinet in the kitchen. no new wall; no modification to existing walls, bathrooms and kitchen to be same size and same location, all work is non structural ; provide h.e. lights per title 24 | $30,000 |
| Dec 8, 2008 | Completed final sign-off Apr 2009 | 537 Victoria St | remodel and new kitchen. two bathroom & full baths. remodel install sink, cabinets, stove etc. new lighting in kitchen.Details
remodel and new kitchen. two bathroom & full baths. remodel install sink, cabinets, stove etc. new lighting in kitchen. | $30,000 |