Mike Kljajic
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Oct 2021
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 expired or cancelled. Typically 152 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2009 | Completed final sign-off Jul 2011 | 890 Junipero Serra Bl | remove door & entryway at side of structure, replace with a window. remove a window at the rear of the structure & replace with a door to a new deck. add stairs from the new deck to an (e) grade, add exterior lighting at the exterior structure (at new deck)Details
remove door & entryway at side of structure, replace with a window. remove a window at the rear of the structure & replace with a door to a new deck. add stairs from the new deck to an (e) grade, add exterior lighting at the exterior structure (at new deck) | $15,000 |
| Dec 20, 2005 | Completed final sign-off Sep 2008 | 205 Cotter St | raise house 3 ft. install new foundation, build new 3rd story addition. rebuild (e) sotricases, add new stair from 3rd flr, install new elevator. minor interior remodeling @ (e) 1st & 2nd floors.Details
raise house 3 ft. install new foundation, build new 3rd story addition. rebuild (e) sotricases, add new stair from 3rd flr, install new elevator. minor interior remodeling @ (e) 1st & 2nd floors. | $225,000 |
| Apr 25, 2002 | Expired or cancelled expired Dec 2004 | 1316 Sanchez St | replace existing stairway at front of the house in kindDetails
replace existing stairway at front of the house in kind | $8,000 |
| Apr 16, 2002 | Completed final sign-off May 2002 | 110 06th Av | stairs repair, 15 treads, 15 risers, 50 percent repair, contact bldng inspc to apprve scopeDetails
stairs repair, 15 treads, 15 risers, 50 percent repair, contact bldng inspc to apprve scope | $2,500 |