Miguel A Padilla Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to May 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 7 completed, 3 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 1072 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2021 | Completed final sign-off Sep 2024 | 2770 23rd St | one kitchen remodel, in kind bathroom remodels (2 full one 1/2 bath), redo flooring (1000 sqft) redo drywall (50% of unit), minor dry rot repairs, replace 3-5 windows (same locations) repair rear deck stairs (<50%), all work at the rear not the front facade (e.o) 9/30/2021Details
one kitchen remodel, in kind bathroom remodels (2 full one 1/2 bath), redo flooring (1000 sqft) redo drywall (50% of unit), minor dry rot repairs, replace 3-5 windows (same locations) repair rear deck stairs (<50%), all work at the rear not the front facade (e.o) 9/30/2021 | $60,000 |