Back to bathroom remodel contractors
Miguel A Padilla Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to May 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 7 completed, 3 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 2 in progress, 2 expired or cancelled. Typically 4 days from filing to permit and 675 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2023 | In progress issued Dec 2023 | 51 Ramona Av | kitchen remodel as is: bathroom remodel as is: repair water damage back area of building with new waterproof wrap and sidingDetails
kitchen remodel as is: bathroom remodel as is: repair water damage back area of building with new waterproof wrap and siding | $20,000 |
| Dec 29, 2023 | In progress filed Dec 2023, not yet issued | 53 Ramona Av | kitchen remodel as is: legalized unpermitted bathroom. repair water damaged, back of buildong with new waterproof wrap and siding.Details
kitchen remodel as is: legalized unpermitted bathroom. repair water damaged, back of buildong with new waterproof wrap and siding. | $15,000 |
| Aug 25, 2022 | Completed final sign-off Sep 2024 | 2770 23rd St | interior stair to 3/f attic, one dormer, remodel 3rd bathroom @ 2/f, new study @ portion of attic floor, attic floor to be upgraded. new double hung aluminum clad wood windows to replace fixed windows at front facade. new horizontal wood siding at front facade.Details
interior stair to 3/f attic, one dormer, remodel 3rd bathroom @ 2/f, new study @ portion of attic floor, attic floor to be upgraded. new double hung aluminum clad wood windows to replace fixed windows at front facade. new horizontal wood siding at front facade. | $60,000 |
| Oct 7, 2021 | Expired or cancelled expired Jan 2025 | 416 Precita Av | rev to pa# 2021-0528-1257; new shower on 1st fl./kitchen remodel, 2 new bathroom 2nd fl. vouluntary seismic upgrade.Details
rev to pa# 2021-0528-1257; new shower on 1st fl./kitchen remodel, 2 new bathroom 2nd fl. vouluntary seismic upgrade. | $120,000 |
| Sep 30, 2021 | Completed final sign-off Sep 2024 | 2770 23rd St | one kitchen remodel, in kind bathroom remodels (2 full one 1/2 bath), redo flooring (1000 sqft) redo drywall (50% of unit), minor dry rot repairs, replace 3-5 windows (same locations) repair rear deck stairs (<50%), all work at the rear not the front facade (e.o) 9/30/2021Details
one kitchen remodel, in kind bathroom remodels (2 full one 1/2 bath), redo flooring (1000 sqft) redo drywall (50% of unit), minor dry rot repairs, replace 3-5 windows (same locations) repair rear deck stairs (<50%), all work at the rear not the front facade (e.o) 9/30/2021 | $60,000 |
| May 28, 2021 | Expired or cancelled expired Jan 2025 | 416 Precita Av | two full bath & one half bathroom & two kitchen remodel in kind. change floor, cabinet,s counters, fix damaged dry wall, replace doors and flooring throughout. refinish hardwood floor on 1st fl. no new wall & no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 &(k)5. work in 2 unitsDetails
two full bath & one half bathroom & two kitchen remodel in kind. change floor, cabinet,s counters, fix damaged dry wall, replace doors and flooring throughout. refinish hardwood floor on 1st fl. no new wall & no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 &(k)5. work in 2 units | $5,000 |
| May 23, 2019 | Completed final sign-off Nov 2020 | 3974 18th St | structural improvement and remodel of (e) room. remodel (e) bathroom and laundry sink. infill of (e) lightwell with new stair connecting basement to level 1.Details
structural improvement and remodel of (e) room. remodel (e) bathroom and laundry sink. infill of (e) lightwell with new stair connecting basement to level 1. | $25,000 |