Back to kitchen remodel contractors
Mighty Moe Construction
- Based in
- San Rafael
- On San Francisco permits
- Feb 2009 to Nov 2012
- Last 24 months
- 0 permits filed
27 permits since 2000: 23 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 52 days from filing to permit and 362 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2012 | Completed final sign-off Nov 2014 | 124 Columbus Av | full remodel of existing basement, 1st and 2nd floor restaurant and bar. provide new stairs, wheel chair lift, accessible restrms, and 2nd fl commercial kitchen per plan. interior work only under this permit. exterior improvements under separate permit201211013265. also renovating 3rd fl offices.Details
full remodel of existing basement, 1st and 2nd floor restaurant and bar. provide new stairs, wheel chair lift, accessible restrms, and 2nd fl commercial kitchen per plan. interior work only under this permit. exterior improvements under separate permit201211013265. also renovating 3rd fl offices. | $275,000 |
| Apr 9, 2012 | Completed final sign-off Jul 2012 | 145 Sutro Heights Av | kitchen remodel. replace all cabinets, plumbing & lighting throughout. existing powder room: replace existing plumbing fixtures. lighting shall comply with cec 150(k) 8Details
kitchen remodel. replace all cabinets, plumbing & lighting throughout. existing powder room: replace existing plumbing fixtures. lighting shall comply with cec 150(k) 8 | $11,000 |