Back to kitchen remodel contractors
Midex Construction
- Based in
- Santa Clara
- On San Francisco permits
- Aug 2016 to Sep 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2016 | Completed final sign-off Mar 2017 | 801 47th Av | #2- paint walls, replace carpet with engineered hardwood floor, rebuild kitchen cabinets, replace bathroom tiles (just floor), remove fireplace & firebox from middle of the room at 3rd floor unit, termite gas, relocate electric switch, no structural, patch floor & ceilingDetails
#2- paint walls, replace carpet with engineered hardwood floor, rebuild kitchen cabinets, replace bathroom tiles (just floor), remove fireplace & firebox from middle of the room at 3rd floor unit, termite gas, relocate electric switch, no structural, patch floor & ceiling | $10,000 |