Back to bathroom remodel contractors
Michael Lo Construction & Plumbing
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Oct 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 23 completed, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 never finaled. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2015 | Completed final sign-off Apr 2016 | 219 Bella Vista Wy | main floor: infill extg lightwell and remodel the kitchen. remove extg wood burning fire place for ethanol fire place. 2nd floor: remodel bathroom, fill in extg window.Details
main floor: infill extg lightwell and remodel the kitchen. remove extg wood burning fire place for ethanol fire place. 2nd floor: remodel bathroom, fill in extg window. | $72,000 |
| May 7, 2014 | Completed final sign-off Aug 2014 | 191 Caselli Av | retile bath room. bath tub enclosure. new tub, toilet, tile floor. new fixture. no alteration of wall & door. replace 1 window at rear side. not visible from street in-kind.Details
retile bath room. bath tub enclosure. new tub, toilet, tile floor. new fixture. no alteration of wall & door. replace 1 window at rear side. not visible from street in-kind. | $14,000 |
| Apr 1, 2014 | Completed final sign-off Jun 2014 | 219 Bella Vista Wy | replace sheet rock study room, approx 700 sq ft. replace bath room window 2'x2' facing lightwell, u factor 0.40 max.Details
replace sheet rock study room, approx 700 sq ft. replace bath room window 2'x2' facing lightwell, u factor 0.40 max. | $4,500 |
| Mar 20, 2014 | Completed final sign-off Jun 2014 | 219 Bella Vista Wy | remodel bathroom. install 29 recess light living room, 4 bedrooms.Details
remodel bathroom. install 29 recess light living room, 4 bedrooms. | $11,000 |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 311 Orizaba Av | retile bathroom: bath tub tile enclosure (10'x5') tile floor (5'x6')Details
retile bathroom: bath tub tile enclosure (10'x5') tile floor (5'x6') | $2,900 |
| Feb 4, 2011 | Never finaled issued Feb 2011, no final | 470 02nd Av | remodel 4 bathrooms more or less 140 sq.ft., sheet rock 2 bedrooms (remove old plaster) more or less 1,300 sq.ft.Details
remodel 4 bathrooms more or less 140 sq.ft., sheet rock 2 bedrooms (remove old plaster) more or less 1,300 sq.ft. | $18,000 |
| Jun 17, 2010 | Completed final sign-off Feb 2011 | 701 03rd Av | *adding shower to (e) bathroom *minor renovation to provide guest bedroom *add one exterior windowDetails
*adding shower to (e) bathroom *minor renovation to provide guest bedroom *add one exterior window | $25,000 |