Melo Willard Tabudlo Dba Dreamt Design
- Based in
- Santa Rosa
- On San Francisco permits
- Jun 2009 to Sep 2026
- Last 24 months
- 6 permits filed
59 permits since 2000: 26 completed, 5 in progress, 21 never finaled, 7 expired or cancelled.
Of the 21 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 69 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2018 | Completed final sign-off Feb 2020 | 724 Lake St | minor interior remodel to existing 2 level condo unit @ 724 lake st (lower unit), construction of new interior open communicating stair within existing 2 level unit, remodel existing bathroom, conversion of existing storage space to habitable spaceDetails
minor interior remodel to existing 2 level condo unit @ 724 lake st (lower unit), construction of new interior open communicating stair within existing 2 level unit, remodel existing bathroom, conversion of existing storage space to habitable space | $30,000 |
| Apr 14, 2016 | Never finaled issued Apr 2016, no final | 3605 20th St | interior alteration of level one retail space to include display area, fitting spaces, back of house, ada bathroom, and a relocated and replaced access stair to basement. also includes new hvac system, lighting, elect and it wiring, and plumbing under separate permit. n/a for maherDetails
interior alteration of level one retail space to include display area, fitting spaces, back of house, ada bathroom, and a relocated and replaced access stair to basement. also includes new hvac system, lighting, elect and it wiring, and plumbing under separate permit. n/a for maher | $200,000 |
| Mar 6, 2013 | Completed final sign-off May 2014 | 710 05th Av | enclose (e) deck area + add a new deck with stair to rear yard.Details
enclose (e) deck area + add a new deck with stair to rear yard. | $20,000 |