Back to kitchen remodel contractors
Mdr Construction
- Based in
- South San Francisco
- On San Francisco permits
- May 2007 to Nov 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 15 completed, 3 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 1 in progress, 2 never finaled. Typically 68 days from filing to permit and 598 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2021 | In progress issued Feb 2024 | 351 Day St | vertical/horizontal addition. 1st flr: add 2 bedroom, full bath, playroom. 2nd flr: remodel kitchen, bathroom, add roof deck @ rear. 3rd flr: add 3 bedrooms, 2 full baths, & cantilever deck @ rear. add roof deck. replace all front windows in-kindDetails
vertical/horizontal addition. 1st flr: add 2 bedroom, full bath, playroom. 2nd flr: remodel kitchen, bathroom, add roof deck @ rear. 3rd flr: add 3 bedrooms, 2 full baths, & cantilever deck @ rear. add roof deck. replace all front windows in-kind | $150,000 |
| Aug 6, 2019 | Completed final sign-off Apr 2023 | 834 London St | 1st fl: add 1 adu on 1st floor per ord. 162-17. add 1 kitchen, living,2 beds and 2 full bath.Details
1st fl: add 1 adu on 1st floor per ord. 162-17. add 1 kitchen, living,2 beds and 2 full bath. | $75,000 |
| Jun 13, 2019 | Completed final sign-off Oct 2021 | 61 Florentine Av | add units per ord 95-17. 1st floor: add new unit per ord 95-17. add 3 bedrooms, 2 full baths, kitchen and living room.Details
add units per ord 95-17. 1st floor: add new unit per ord 95-17. add 3 bedrooms, 2 full baths, kitchen and living room. | $92,000 |
| May 24, 2019 | Never finaled issued Sep 2020, no final | 43 Del Monte St | add units per ord #95-17. 1st flr-add new adu unit per ord 95-17. add kitchen, living, 2 bedrooms and 1 full bathroom.Details
add units per ord #95-17. 1st flr-add new adu unit per ord 95-17. add kitchen, living, 2 bedrooms and 1 full bathroom. | $90,000 |
| Apr 9, 2019 | Completed final sign-off Oct 2021 | 63 Florentine Av | 2nd fl: remodel kitchen & bath. add 2 bedrooms, 1 full bath, and laundry. 1st fl: infill at rear.Details
2nd fl: remodel kitchen & bath. add 2 bedrooms, 1 full bath, and laundry. 1st fl: infill at rear. | $40,000 |
| Apr 2, 2019 | Never finaled issued May 2019, no final | 43 Del Monte St | 2nd floor: remodel kitchen and bath, add 1 full bath. infill southwest lightwell and new deck at rear.Details
2nd floor: remodel kitchen and bath, add 1 full bath. infill southwest lightwell and new deck at rear. | $50,000 |
| Sep 13, 2018 | Completed final sign-off May 2023 | 1429 Oak St | comply with nov #201890521, 201548041, & 201563981. 1429a: remodel kitchen & bath. add 1 bath & 1 bedroom. 1429b: relocate kitchen & bath. add 1 bedroom. 1431a: remodel kitchen, relocate bath, & add 1 bedroom. 1431b: relocate kitchen and remodel bath.Details
comply with nov #201890521, 201548041, & 201563981. 1429a: remodel kitchen & bath. add 1 bath & 1 bedroom. 1429b: relocate kitchen & bath. add 1 bedroom. 1431a: remodel kitchen, relocate bath, & add 1 bedroom. 1431b: relocate kitchen and remodel bath. | $150,000 |
| Oct 18, 2010 | Completed final sign-off Jan 2011 | 116 San Carlos St | unit #2 & 4: remodel kitchen & bathroom, replace flooring & countertops, 4-electrical circuits in both units, no wall removal. provide high efficiency lights per cec 150 (k).Details
unit #2 & 4: remodel kitchen & bathroom, replace flooring & countertops, 4-electrical circuits in both units, no wall removal. provide high efficiency lights per cec 150 (k). | $31,000 |
| Jul 7, 2010 | Completed final sign-off Sep 2010 | 3900 California St | unit # 4: kitchen remodel: new cabinets & appliances, stove, microwave and sink. at least 50% high efficacy lighting (by wattage). no change to exhaust system.Details
unit # 4: kitchen remodel: new cabinets & appliances, stove, microwave and sink. at least 50% high efficacy lighting (by wattage). no change to exhaust system. | |
| May 24, 2007 | Completed final sign-off Aug 2007 | 326 Ewing Tr | 3 bathrooms, kitchen, floor tile family room 20 reccess light, roof, upgrade electrical plumbing. repair front deck & possible dryrot to the wall below.Details
3 bathrooms, kitchen, floor tile family room 20 reccess light, roof, upgrade electrical plumbing. repair front deck & possible dryrot to the wall below. | $85,000 |