Back to kitchen remodel contractors
Mcdp Dba Geothersun Construction
- Based in
- Mill Valley
- On San Francisco permits
- Feb 2012 to Sep 2026
- Last 24 months
- 7 permits filed
50 permits since 2000: 30 completed, 3 in progress, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 2 days from filing to permit and 396 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2024 | Completed final sign-off Jul 2026 | 121 Ellert St | interior remodel demo / repair existing stairs - replace inkind. (n) interior stairs, (n) secondary kitchen+bathroom on lower floor.Details
interior remodel demo / repair existing stairs - replace inkind. (n) interior stairs, (n) secondary kitchen+bathroom on lower floor. | $600,000 |
| Apr 19, 2022 | Completed final sign-off May 2022 | 1843 15th Av | revision to bpa# 202112104199 to increase valuation to $75,000. per field insp. revise the scope of work under pa#202112104199 to read the full and complete remodel of one kitchen and two bathrooms.Details
revision to bpa# 202112104199 to increase valuation to $75,000. per field insp. revise the scope of work under pa#202112104199 to read the full and complete remodel of one kitchen and two bathrooms. | $75,000 |
| Dec 10, 2021 | Completed final sign-off Jun 2022 | 1843 15th Av | kitchen as is using same floor plan remodel cosemetic work. 2 bathroom remodel using same floor plan cosemtic.Details
kitchen as is using same floor plan remodel cosemetic work. 2 bathroom remodel using same floor plan cosemtic. | $5,000 |
| Aug 27, 2021 | Completed final sign-off Apr 2022 | 234 Bennington St | remove secondary entrance on newman street corner entrance to bedroom. kitchen remodel. new window will be wood outside/inside.Details
remove secondary entrance on newman street corner entrance to bedroom. kitchen remodel. new window will be wood outside/inside. | $6,000 |
| Mar 11, 2021 | Completed final sign-off Jan 2025 | 175 Delmar St | remodel 3/f attic into occupied space for a master suite (one bed, full bath, walk-in closet, & laundry). siding and window upgrade at rear elevation. kitchen and bathroom renovation at 1/f. lower basement slab to increase head room to create habitable space at basement levelDetails
remodel 3/f attic into occupied space for a master suite (one bed, full bath, walk-in closet, & laundry). siding and window upgrade at rear elevation. kitchen and bathroom renovation at 1/f. lower basement slab to increase head room to create habitable space at basement level | $400,000 |
| Dec 23, 2019 | Completed final sign-off Jan 2021 | 356 Pierce St | remodel kitchen and bathroom. no change in design or locationDetails
remodel kitchen and bathroom. no change in design or location | $6,000 |
| Oct 7, 2019 | Completed final sign-off Dec 2020 | 1746 12th Av | remodel kitchen. change ele panel replace deck like for like as the original design. rewire the house electricalDetails
remodel kitchen. change ele panel replace deck like for like as the original design. rewire the house electrical | $10,000 |
| Sep 19, 2018 | Never finaled issued Jan 2019, no final | 151 Downey St | interior remodel to include: remodel kitchen, add half bathroom, remove chimney, add bedroom and bathroom at attic. add window on rear elev into match exist trim and sidingDetails
interior remodel to include: remodel kitchen, add half bathroom, remove chimney, add bedroom and bathroom at attic. add window on rear elev into match exist trim and siding | $50,000 |
| Mar 28, 2017 | Never finaled issued Mar 2017, no final | 2919 California St | cosmetic work on (e) 2 baths & 1 kitchen. change tile, windows & doors.Details
cosmetic work on (e) 2 baths & 1 kitchen. change tile, windows & doors. | $100,000 |
| Jun 19, 2014 | Completed final sign-off Dec 2015 | 294 Page St | kitchen remodel & new dumb waiters.Details
kitchen remodel & new dumb waiters. | $15,000 |
| May 8, 2014 | Completed final sign-off Nov 2015 | 254 Lexington St | to comply with physical inspection report # cc-7635, paritally to legalize 4 kitchens & 4 bathrooms, remodeling without permit (1 each permit) for the 4 units, no change in walls # opening layout.Details
to comply with physical inspection report # cc-7635, paritally to legalize 4 kitchens & 4 bathrooms, remodeling without permit (1 each permit) for the 4 units, no change in walls # opening layout. | $80,000 |