Mc Kenna Plastering
- Based in
- San Leandro
- On San Francisco permits
- Feb 2021 to Aug 2025
- Last 24 months
- 7 permits filed
19 permits since 2000: 14 completed, 3 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2024 | Completed final sign-off Apr 2025 | 730 45th Av | stucco leaking re do the stucco in kind. wire + new waterproofing new weep installed per code leaking from outside to inside (front). approx. 400 sq ft at front and side at stairs.Details
stucco leaking re do the stucco in kind. wire + new waterproofing new weep installed per code leaking from outside to inside (front). approx. 400 sq ft at front and side at stairs. | $5,200 |