Back to kitchen remodel contractors
Mc Gehee Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2023 to Jul 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2023 | Never finaled filed Nov 2023, never issued | 829 Hayes St | unit 4: kitchen remodel: no chnage to layout. replacement of 2 windows at back of building.Details
unit 4: kitchen remodel: no chnage to layout. replacement of 2 windows at back of building. | $20,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 88 Mercedes Wy | kitchen remodel. installation of (2) new windows at side of house to replace existing.Details
kitchen remodel. installation of (2) new windows at side of house to replace existing. | $60,000 |