Mc Cluskey Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2003 to Mar 2019
- Last 24 months
- 0 permits filed
43 permits since 2000: 36 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 0 days from filing to permit and 41 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2009 | Completed final sign-off Aug 2009 | 276 05th Av | remove & replace dry rot on back stairs 2 landingd, 8 steps 3 handrails approx. 25% of total area. not visible from street. timbers are preassure treated or redwood.Details
remove & replace dry rot on back stairs 2 landingd, 8 steps 3 handrails approx. 25% of total area. not visible from street. timbers are preassure treated or redwood. | $7,200 |
| Aug 27, 2008 | Completed final sign-off Dec 2008 | 2570 Sutter St | soil stabilization, backfill, repair path, stair on grade, underpin foundation as necessary, move window. ref app 200501112946Details
soil stabilization, backfill, repair path, stair on grade, underpin foundation as necessary, move window. ref app 200501112946 | $15,000 |
| Aug 24, 2007 | Completed final sign-off Oct 2007 | 279 Dalewood Wy | replace in-kind rear deck ( 3'-6" above grade) and stair. replace (e) wood retaining wall with new steel beam and pressure treated lagging. no work on (e) fence behind retaining wall.Details
replace in-kind rear deck ( 3'-6" above grade) and stair. replace (e) wood retaining wall with new steel beam and pressure treated lagging. no work on (e) fence behind retaining wall. | $20,000 |
| Jun 27, 2005 | Completed final sign-off Jun 2005 | 1366 La Playa | repair dry rot damage to deck & stair (rear) in kind - less than 50 percent being replacedDetails
repair dry rot damage to deck & stair (rear) in kind - less than 50 percent being replaced | $3,600 |
| Feb 11, 2004 | Completed final sign-off Mar 2004 | 131 Chaves Av | dryrot repair at walls and stairs at rear and sideDetails
dryrot repair at walls and stairs at rear and side | $16,000 |
| Sep 23, 2003 | Completed final sign-off Dec 2003 | 27 Blair Tr | remove closet under stairway and widen opening adjacent t0 closet. move front door within building eDetails
remove closet under stairway and widen opening adjacent t0 closet. move front door within building e | $12,000 |
| Jan 15, 2003 | Completed final sign-off Feb 2003 | 1425 De Haro St | remove and replace 7 windows and siding redwood in kind. paint remove & replace stair ( stringlers fDetails
remove and replace 7 windows and siding redwood in kind. paint remove & replace stair ( stringlers f | $21,000 |