Maxi Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Jun 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 146 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2008 | Completed final sign-off Dec 2009 | 71 Glenview Dr | two-story horizontal addition to the rear for (n) bedroom and (n) fam. room at 1st fl, (n) master bedroom and (n) breakfast rm including (n) deck at 2nd fl. enlarge and remodel (e) bath at 2nd and 1st floors, remodel (e) kitchen.Details
two-story horizontal addition to the rear for (n) bedroom and (n) fam. room at 1st fl, (n) master bedroom and (n) breakfast rm including (n) deck at 2nd fl. enlarge and remodel (e) bath at 2nd and 1st floors, remodel (e) kitchen. | $80,000 |