Back to bathroom remodel contractors
Maxi Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Jun 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2010 | Completed final sign-off Jan 2011 | 195 18th Av | replace kitchen cabinets and counter tops, tiles and bathroom wall tiles on units at 2nd and 3rd floor. no wall removal.Details
replace kitchen cabinets and counter tops, tiles and bathroom wall tiles on units at 2nd and 3rd floor. no wall removal. | $7,000 |
| Feb 17, 2010 | Completed final sign-off Sep 2010 | 818 30th Av | unit 818a at ground/garage floor. add one full bath, bed rm, fam rm. relocate (e) laundry area to new location. (n) heating/utility and construct new stairs to the upper level unit 818aDetails
unit 818a at ground/garage floor. add one full bath, bed rm, fam rm. relocate (e) laundry area to new location. (n) heating/utility and construct new stairs to the upper level unit 818a | $106,000 |
| Jan 20, 2009 | Completed final sign-off Aug 2009 | 1882 14th Av | 2 samll bathroom 1st fl & 2nd fl.repair/remodel. provide fluorescent light or "manual on" occupancy sensor in bathrooms.Details
2 samll bathroom 1st fl & 2nd fl.repair/remodel. provide fluorescent light or "manual on" occupancy sensor in bathrooms. | $5,000 |
| Aug 1, 2008 | Completed final sign-off Jan 2009 | 219 17th Av | 2nd & 3rd floor-remodel (e) kitchens, remodel (e) bathrooms and convert (e) sunroom to full bathroom. add laundry rooms. 1st floor-relocate (e) utilityDetails
2nd & 3rd floor-remodel (e) kitchens, remodel (e) bathrooms and convert (e) sunroom to full bathroom. add laundry rooms. 1st floor-relocate (e) utility | $25,000 |
| Mar 21, 2008 | Completed final sign-off Dec 2009 | 71 Glenview Dr | two-story horizontal addition to the rear for (n) bedroom and (n) fam. room at 1st fl, (n) master bedroom and (n) breakfast rm including (n) deck at 2nd fl. enlarge and remodel (e) bath at 2nd and 1st floors, remodel (e) kitchen.Details
two-story horizontal addition to the rear for (n) bedroom and (n) fam. room at 1st fl, (n) master bedroom and (n) breakfast rm including (n) deck at 2nd fl. enlarge and remodel (e) bath at 2nd and 1st floors, remodel (e) kitchen. | $80,000 |