Back to kitchen remodel contractors
Max Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to Feb 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 60 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off Dec 2025 | 3285 Cesar Chavez St | interior remodeling at 2nd floor sfp: add new master bedroom. remodel extg bathroom, kitchen, dining room. add roof cover over existing 6 foot rear deck.Details
interior remodeling at 2nd floor sfp: add new master bedroom. remodel extg bathroom, kitchen, dining room. add roof cover over existing 6 foot rear deck. | $20,000 |
| Jul 17, 2023 | Completed final sign-off Jan 2024 | 1554 Alemany Bl | (e) kitchen remodel like to like, replace new cabinets, reuse stove, refirgerator (no walls removed). upgrade the service to a 200 amp service with a 24 circuit load - relocate sink.Details
(e) kitchen remodel like to like, replace new cabinets, reuse stove, refirgerator (no walls removed). upgrade the service to a 200 amp service with a 24 circuit load - relocate sink. | $15,000 |