Matthew Kelly Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Sep 2026
- Last 24 months
- 31 permits filed
46 permits since 2000: 35 completed, 10 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 7 completed, 2 in progress. Typically 22 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2026 | In progress issued Jun 2026 | 708 Cole St | exterior stair repair, front stair case, replace trads, risers, trim due to dryrot. less than 50% repair, street facing.Details
exterior stair repair, front stair case, replace trads, risers, trim due to dryrot. less than 50% repair, street facing. | $21,000 |
| May 22, 2026 | In progress issued Aug 2026 | 148 Marston Av | voluntary structural strengthening, partial foundation replacement, new front awning and replacement of the (e) front staircase, siding, windows and enlarged front door.Details
voluntary structural strengthening, partial foundation replacement, new front awning and replacement of the (e) front staircase, siding, windows and enlarged front door. | $50,000 |
| Aug 12, 2025 | Completed final sign-off Nov 2025 | 450 08th Av | to comply with 202539414 reconstruction (e) 3 story wood framed egress stair & deck; structure in-kind replace/upgrade all framing & replace and upgrade all framing & foundationsDetails
to comply with 202539414 reconstruction (e) 3 story wood framed egress stair & deck; structure in-kind replace/upgrade all framing & replace and upgrade all framing & foundations | $10,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 779 Head St | replace front exterior stairsDetails
replace front exterior stairs | $3,000 |
| May 29, 2025 | Completed final sign-off Sep 2025 | 779 Head St | revise permit 202505065868, replace under 50% of ext. stairs in like inkind at front entryDetails
revise permit 202505065868, replace under 50% of ext. stairs in like inkind at front entry | $15,000 |
| May 19, 2025 | Completed final sign-off Aug 2025 | 1244 06th Av | replace and upgrade existing 3-story north center lightwell. egress stairwell to comply with mandatory ordinance ca sb 326. framing and foundation replacement. this stair is a common egress used by all units of the building.Details
replace and upgrade existing 3-story north center lightwell. egress stairwell to comply with mandatory ordinance ca sb 326. framing and foundation replacement. this stair is a common egress used by all units of the building. | $26,000 |
| Jan 23, 2025 | Completed final sign-off Apr 2026 | 1510 Dolores St | remove & replace (e) wood stairs. like for like.Details
remove & replace (e) wood stairs. like for like. | $15,000 |
| Nov 19, 2024 | Completed final sign-off Feb 2025 | 2490 Chestnut St | replace fire egress stairs in kind in the lightwell due to significant deterioration. no change in orientation. no firewall construction. replace loose bolts in kind in e metal stairs.Details
replace fire egress stairs in kind in the lightwell due to significant deterioration. no change in orientation. no firewall construction. replace loose bolts in kind in e metal stairs. | $50,000 |
| Mar 25, 2022 | Completed final sign-off Jan 2023 | 3207 Market St | to replace in kind exisitng decks, guardrails, stairs and back of house, siding due to wood rot. to remove (e) hot tub from lower deck to create covered seating. (e) tool and gardening room will be made into one room. (e) laundry room will be remodeld to have enclosed storage. and built in cabinets.Details
to replace in kind exisitng decks, guardrails, stairs and back of house, siding due to wood rot. to remove (e) hot tub from lower deck to create covered seating. (e) tool and gardening room will be made into one room. (e) laundry room will be remodeld to have enclosed storage. and built in cabinets. | $100,000 |