Back to kitchen remodel contractors
Matt Ringhofer
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2000 to Sep 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2014 | Completed final sign-off May 2016 | 25 San Pablo Av | remove non load bearing wall and remodel kitchen per plan, new landing and new side door to outside in kitchen. maher n/a.Details
remove non load bearing wall and remodel kitchen per plan, new landing and new side door to outside in kitchen. maher n/a. | $30,000 |
| May 25, 2012 | Completed final sign-off Dec 2012 | 427 Utah St | remodel kitchen, new windows, remove non-bearing walls. now visable from street.Details
remodel kitchen, new windows, remove non-bearing walls. now visable from street. | $60,000 |
| Sep 22, 2009 | Completed final sign-off Jan 2010 | 46 Salmon St | remoel kitchen: (n) cabinets, sink, appliances. remodel bath: (n) fixtures, both bath & kitchen upgrade electric & plumbing. tile floors both rooms. move location of toilet & add sink in bath (none now) & add stove in kitchen (none now).Details
remoel kitchen: (n) cabinets, sink, appliances. remodel bath: (n) fixtures, both bath & kitchen upgrade electric & plumbing. tile floors both rooms. move location of toilet & add sink in bath (none now) & add stove in kitchen (none now). | $47,000 |
| Dec 24, 2002 | Completed final sign-off Mar 2003 | 144 Alhambra St | new kitchen counter tops,sink,new vinyl flr,new appliances paint,upgrade outlets in kitchen to gfi.Details
new kitchen counter tops,sink,new vinyl flr,new appliances paint,upgrade outlets in kitchen to gfi. | $12,000 |
| Oct 12, 2000 | Completed final sign-off Mar 2001 | 159 Chattanooga St | repair unit in kitchen area, window,door,walls,cabinets,#163a damaged by fire.Details
repair unit in kitchen area, window,door,walls,cabinets,#163a damaged by fire. | $35,000 |