Back to kitchen remodel contractors
Masterpiece Steel Stud Systems
- Based in
- Discovery Bay
- On San Francisco permits
- Aug 2020 to Dec 2024
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 44 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2020 | Never finaled issued Oct 2020, no final | 3250 Van Ness Av | install 3 compartment sink, hand sink, & repairs to existing appliances per sfdph inspection of kitchen associated with 3rd floor cafe. work includes repairs & installation of plumbing fixtures. no new mech or electrical work being proposed.Details
install 3 compartment sink, hand sink, & repairs to existing appliances per sfdph inspection of kitchen associated with 3rd floor cafe. work includes repairs & installation of plumbing fixtures. no new mech or electrical work being proposed. | $20,000 |