Back to kitchen remodel contractors
Master Woodworks
- Based in
- Nevada City
- On San Francisco permits
- Oct 2015 to Oct 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 1 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2015 | Completed final sign-off Feb 2016 | 1538 26th Av | remove (e) cabinets, remove 2 soffits @ upper cabinets. remove partial wall between kitchen & dining. cut opening (pass through) between kitchen & hall. new cabinets under cabinet lighting, paint, minor drywall repair, floor, kitchen sink hook-upDetails
remove (e) cabinets, remove 2 soffits @ upper cabinets. remove partial wall between kitchen & dining. cut opening (pass through) between kitchen & hall. new cabinets under cabinet lighting, paint, minor drywall repair, floor, kitchen sink hook-up | $45,000 |