Back to kitchen remodel contractors
Marvel Construction Company Inc
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2014 to Apr 2018
- Last 24 months
- 0 permits filed
47 permits since 2000: 42 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 2 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2018 | Completed final sign-off Jun 2019 | 636 Octavia St | revision to 201712116133, revised configuration of ada bathroom, kitchen & rear yard door & windowDetails
revision to 201712116133, revised configuration of ada bathroom, kitchen & rear yard door & window | |
| Mar 5, 2018 | Completed final sign-off Mar 2018 | 64 Grand View Av | replace in kind 4 windows in the light well area, 1 in the hallway, 2 in the dining room & one 1n the kitchen, no structural work done.Details
replace in kind 4 windows in the light well area, 1 in the hallway, 2 in the dining room & one 1n the kitchen, no structural work done. | $1,800 |
| Dec 11, 2017 | Completed final sign-off Jun 2019 | 636 Octavia St | revision to pa #201605318786- minor change to kitchen/ada bath/rear door. patio in rear removed from scope, existing concrete floor to remain/lowered floor removed from scope, roof deck removed from scope of work.Details
revision to pa #201605318786- minor change to kitchen/ada bath/rear door. patio in rear removed from scope, existing concrete floor to remain/lowered floor removed from scope, roof deck removed from scope of work. | |
| Mar 15, 2016 | Completed final sign-off Apr 2017 | 281 Gold Mine Dr | remodel existing kitchen. no change of parking. no change of occupancy, no change of building area.Details
remodel existing kitchen. no change of parking. no change of occupancy, no change of building area. | $25,000 |
| Mar 1, 2016 | Completed final sign-off May 2016 | 3519 19th St | interior remodel widen kitchen opening, create new full bath in unit 3519, 2nd flDetails
interior remodel widen kitchen opening, create new full bath in unit 3519, 2nd fl | $24,000 |
| Dec 11, 2015 | Completed final sign-off May 2016 | 3519 19th St | kitchen remodel. no structural work. replace cabinets and appliances. replace two windows in the back and one back door in-kind, same size. replace old water heater new tankless water heater. repair dry rot sub-floor at laundry area. mp structural.Details
kitchen remodel. no structural work. replace cabinets and appliances. replace two windows in the back and one back door in-kind, same size. replace old water heater new tankless water heater. repair dry rot sub-floor at laundry area. mp structural. | $42,000 |
| Aug 13, 2015 | Completed final sign-off Nov 2015 | 100 Romain St | legalize (e) guest room & bath @ ground floor. reduce sliding doors size in bedroom on 2nd floor, remove wall in kitchen, replace 3 skylights, install 1 new skylight in staircase.Details
legalize (e) guest room & bath @ ground floor. reduce sliding doors size in bedroom on 2nd floor, remove wall in kitchen, replace 3 skylights, install 1 new skylight in staircase. | $22,000 |
| Jul 17, 2015 | Completed final sign-off Nov 2015 | 100 Romain St | remodel kitchen, remove/replace cabinets and counter top. replace windows - 2 front on romain, 9 side on grandview, 4 rear, 4 side (total 19 windows). replace marvin brand in size. (aluminum clad with same operable direction). marvin brand. u factor not > .32Details
remodel kitchen, remove/replace cabinets and counter top. replace windows - 2 front on romain, 9 side on grandview, 4 rear, 4 side (total 19 windows). replace marvin brand in size. (aluminum clad with same operable direction). marvin brand. u factor not > .32 | $30,000 |
| Apr 13, 2015 | Completed final sign-off Sep 2015 | 223 Romain St | kitchen remodel with new cabinets, appliances, fixtures, lighting, bath remodel with new cabinets, fixtures, finishes, lighting. replace window at kitchen in kind. remove existing walls between kitchen and livng rm 4 new skylightsDetails
kitchen remodel with new cabinets, appliances, fixtures, lighting, bath remodel with new cabinets, fixtures, finishes, lighting. replace window at kitchen in kind. remove existing walls between kitchen and livng rm 4 new skylights | $25,000 |
| Dec 4, 2014 | Completed final sign-off Feb 2015 | 139 Baden St | remove wall between living room and kitchen arear. install new psl per plans, reinforce piers footing per plans onlyDetails
remove wall between living room and kitchen arear. install new psl per plans, reinforce piers footing per plans only | $5,000 |