Back to bathroom remodel contractors
Marucheck Construction
- Based in
- Berkeley
- On San Francisco permits
- Mar 2012 to Mar 2021
- Last 24 months
- 0 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Sep 2024 | 53 Potomac St | remodel/refresh kitchens- baths (new cabinets, some new appliances, fixtures) total of (2) kitchens (4) baths. no wall demolition. no layout change.Details
remodel/refresh kitchens- baths (new cabinets, some new appliances, fixtures) total of (2) kitchens (4) baths. no wall demolition. no layout change. | $20,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2024 | 53 Potomac St | alteration of 4th floor apartment to add mezzanine, new kitchen, new 1 1/2 bath.Details
alteration of 4th floor apartment to add mezzanine, new kitchen, new 1 1/2 bath. | $125,000 |
| May 23, 2019 | Completed final sign-off Jun 2019 | 351 Vallejo St | rev to pa201901170577: increase evaluation by $50k per bid rp and to include second bathroom remodeling.Details
rev to pa201901170577: increase evaluation by $50k per bid rp and to include second bathroom remodeling. | $50,000 |
| Jun 5, 2015 | Completed final sign-off May 2016 | 601 04th St | interior remodel of existing live-work space. remodel existing bathroom. add washer and dryer per plan. sprinkler work under separate permit. maher n/a.Details
interior remodel of existing live-work space. remodel existing bathroom. add washer and dryer per plan. sprinkler work under separate permit. maher n/a. | $65,000 |
| Jul 2, 2014 | Completed final sign-off Sep 2014 | 1421 Golden Gate Av | bathroom remodel - keep existing layout. new shower valve, new led lights on 1st floor onlyDetails
bathroom remodel - keep existing layout. new shower valve, new led lights on 1st floor only | $17,000 |
| Mar 17, 2014 | Completed final sign-off Oct 2014 | 1250 29th Av | bathroom remodel, keep existing layout ,new fixtures and finishes, at top floor.Details
bathroom remodel, keep existing layout ,new fixtures and finishes, at top floor. | $50,000 |
| Jul 1, 2013 | Completed final sign-off Jun 2014 | 53 Parker Av | bathroom remodel: replace tub, shower, toilet, lighting, window in (e) opening.Details
bathroom remodel: replace tub, shower, toilet, lighting, window in (e) opening. | $30,000 |
| May 21, 2013 | Completed final sign-off Jun 2013 | 114 Clifford Tr | bath remodel - no changes to layout keep existing tub/toilet & cabinets. new surround, counter, lights.Details
bath remodel - no changes to layout keep existing tub/toilet & cabinets. new surround, counter, lights. | $16,000 |
| Mar 13, 2012 | Completed final sign-off Jun 2012 | 1340 Fell St | 1 bathroom remodel, new tub, move toilet, move shower, new washer/dryer. lighting to comply with cec 150 (k).Details
1 bathroom remodel, new tub, move toilet, move shower, new washer/dryer. lighting to comply with cec 150 (k). | $16,000 |