Marucheck Construction
- Based in
- Berkeley
- On San Francisco permits
- Mar 2012 to Mar 2021
- Last 24 months
- 0 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Sep 2024 | 53 Potomac St | remodel/refresh kitchens- baths (new cabinets, some new appliances, fixtures) total of (2) kitchens (4) baths. no wall demolition. no layout change.Details
remodel/refresh kitchens- baths (new cabinets, some new appliances, fixtures) total of (2) kitchens (4) baths. no wall demolition. no layout change. | $20,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2024 | 53 Potomac St | alteration of 4th floor apartment to add mezzanine, new kitchen, new 1 1/2 bath.Details
alteration of 4th floor apartment to add mezzanine, new kitchen, new 1 1/2 bath. | $125,000 |
| May 24, 2019 | Completed final sign-off Feb 2021 | 57 Potomac St | voluntary strengthening at ground floor.Details
voluntary strengthening at ground floor. | $80,000 |
| May 23, 2019 | Completed final sign-off Jun 2019 | 351 Vallejo St | rev to pa201901170577: increase evaluation by $50k per bid rp and to include second bathroom remodeling.Details
rev to pa201901170577: increase evaluation by $50k per bid rp and to include second bathroom remodeling. | $50,000 |
| Jan 17, 2019 | Completed final sign-off Jun 2019 | 351 Vallejo St | redecorate & replace worn out cabinets & countertops in kitchen + paint + carpet + fixturesDetails
redecorate & replace worn out cabinets & countertops in kitchen + paint + carpet + fixtures | $10,000 |
| Oct 7, 2016 | Completed final sign-off Nov 2016 | 100 Cedro Av | add drywall to unfinished portion of garage, replace interior door (20 min. solid core door).Details
add drywall to unfinished portion of garage, replace interior door (20 min. solid core door). | $3,000 |
| Apr 5, 2016 | Completed final sign-off Feb 2019 | 53 Potomac St | restore building entry so there are 3 separate entrances to 3 flats, replace windows in back (west) of building on 3rd (top) floor, replace railing on front entry stairs.Details
restore building entry so there are 3 separate entrances to 3 flats, replace windows in back (west) of building on 3rd (top) floor, replace railing on front entry stairs. | $10,000 |
| Jun 5, 2015 | Completed final sign-off May 2016 | 601 04th St | interior remodel of existing live-work space. remodel existing bathroom. add washer and dryer per plan. sprinkler work under separate permit. maher n/a.Details
interior remodel of existing live-work space. remodel existing bathroom. add washer and dryer per plan. sprinkler work under separate permit. maher n/a. | $65,000 |
| Feb 11, 2015 | Completed final sign-off Nov 2015 | 130 Roosevelt Wy | revision to 201409166495 beam modificationDetails
revision to 201409166495 beam modification | $6,000 |
| Feb 11, 2015 | Completed final sign-off Jan 2016 | 2954 Diamond St | replace windows and siding at front of building. no changes to window size or location or configuration. new siding to match existing: brick base, shingles above and stucco on bays. windows to be metal or fiberglass.Details
replace windows and siding at front of building. no changes to window size or location or configuration. new siding to match existing: brick base, shingles above and stucco on bays. windows to be metal or fiberglass. | $35,000 |
| Sep 16, 2014 | Completed final sign-off Nov 2015 | 130 Roosevelt Wy | remove bearing wall and replace with beam. remodel kitchen. add washer/dryerDetails
remove bearing wall and replace with beam. remodel kitchen. add washer/dryer | $80,000 |
| Jul 2, 2014 | Completed final sign-off Sep 2014 | 1421 Golden Gate Av | bathroom remodel - keep existing layout. new shower valve, new led lights on 1st floor onlyDetails
bathroom remodel - keep existing layout. new shower valve, new led lights on 1st floor only | $17,000 |
| Mar 17, 2014 | Completed final sign-off Oct 2014 | 1250 29th Av | bathroom remodel, keep existing layout ,new fixtures and finishes, at top floor.Details
bathroom remodel, keep existing layout ,new fixtures and finishes, at top floor. | $50,000 |
| Aug 20, 2013 | Completed final sign-off Jun 2014 | 53 Parker Av | kitchen remodel - new cabinets, appliances, lighting to meet title 24, no structural work.Details
kitchen remodel - new cabinets, appliances, lighting to meet title 24, no structural work. | $40,000 |
| Jul 1, 2013 | Completed final sign-off Jun 2014 | 53 Parker Av | bathroom remodel: replace tub, shower, toilet, lighting, window in (e) opening.Details
bathroom remodel: replace tub, shower, toilet, lighting, window in (e) opening. | $30,000 |
| May 21, 2013 | Completed final sign-off Jun 2013 | 114 Clifford Tr | bath remodel - no changes to layout keep existing tub/toilet & cabinets. new surround, counter, lights.Details
bath remodel - no changes to layout keep existing tub/toilet & cabinets. new surround, counter, lights. | $16,000 |
| Apr 4, 2012 | Completed final sign-off Feb 2013 | 1336 Fell St | reconstruction of front entry stairs in kindDetails
reconstruction of front entry stairs in kind | $19,000 |
| Mar 13, 2012 | Completed final sign-off Jun 2012 | 1340 Fell St | 1 bathroom remodel, new tub, move toilet, move shower, new washer/dryer. lighting to comply with cec 150 (k).Details
1 bathroom remodel, new tub, move toilet, move shower, new washer/dryer. lighting to comply with cec 150 (k). | $16,000 |