Back to kitchen remodel contractors
Martinez Construction A Partnership
- Based in
- Novato
- On San Francisco permits
- Sep 2008 to Mar 2010
- Last 24 months
- 0 permits filed
10 permits since 2000: 3 completed, 7 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2009 | Completed final sign-off Jun 2009 | 490 Pennsylvania Av | remodel both units of existing building. redo kitchen, 2 bathrooms (1 for each unit) counter tops, cabinets, change existing windows. change electrical sub panel. 24 windows to be replaced. plus 2 sliding doors. carpet & painting. kitchen = 10' x 8' = 80 sq. ft. bathroom = 10' x6' = 60 sq. ft.Details
remodel both units of existing building. redo kitchen, 2 bathrooms (1 for each unit) counter tops, cabinets, change existing windows. change electrical sub panel. 24 windows to be replaced. plus 2 sliding doors. carpet & painting. kitchen = 10' x 8' = 80 sq. ft. bathroom = 10' x6' = 60 sq. ft. | $50,000 |