Back to kitchen remodel contractors
Martinez Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Sep 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 2 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2013 | Never finaled issued Apr 2013, no final | 1276 11th Av | convert former storage and portion of garage to livings space. rebuild interior stairs and build interior stairs and build bed room, laundry and bath at 1st floor. remodel kitchen. reconfigure bedrooms at 3rd floor and add bathroom at 3rd floor. mep under seperate permit.Details
convert former storage and portion of garage to livings space. rebuild interior stairs and build interior stairs and build bed room, laundry and bath at 1st floor. remodel kitchen. reconfigure bedrooms at 3rd floor and add bathroom at 3rd floor. mep under seperate permit. | $187,500 |
| Mar 6, 2008 | Expired or cancelled expired Mar 2012 | 432 Cole St | remodel kitchen on the 1st floor with new carbinets, countertops and appliances. move powder rm.to new location. new electrical, plumbing as needed. replace 1 door and 1 window in the rear. all work on 1st floor only.Details
remodel kitchen on the 1st floor with new carbinets, countertops and appliances. move powder rm.to new location. new electrical, plumbing as needed. replace 1 door and 1 window in the rear. all work on 1st floor only. | $45,000 |
| Feb 2, 2007 | Expired or cancelled cancelled Aug 2007 | 811 Page St | remodel kitchen and bathroom add hardwood floor over existing sub floor and install new fixturesDetails
remodel kitchen and bathroom add hardwood floor over existing sub floor and install new fixtures | $6,000 |
| Jul 28, 2004 | Expired or cancelled expired Aug 2005 | 1905 Laguna St | replace kitchen cabinets repair sheetrock and plaster replace bathrm tiles same kind install g.f.iDetails
replace kitchen cabinets repair sheetrock and plaster replace bathrm tiles same kind install g.f.i | $3,000 |