Martin Paul Duggan Contracting
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jan 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 74 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 146 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 406 30th St | interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof.Details
interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof. | $150,000 |
| Mar 27, 2017 | Completed final sign-off Mar 2019 | 706 11th Av | horizontally expand residence to the rear @ the ground flr 214 sq. ft for a (n) bdrm & full bathroom. an (e) hall in the garage will be conditioned. a (n) 125 sq. ft deck wil be added above the addition.Details
horizontally expand residence to the rear @ the ground flr 214 sq. ft for a (n) bdrm & full bathroom. an (e) hall in the garage will be conditioned. a (n) 125 sq. ft deck wil be added above the addition. | $45,000 |
| Dec 19, 2016 | Never finaled issued Dec 2016, no final | 211 Upper Tr | install wood deck over (e) patio at grade. replace (e) fence in-kind.all work rear yeard not visible from street.Details
install wood deck over (e) patio at grade. replace (e) fence in-kind.all work rear yeard not visible from street. | $15,000 |
| Oct 25, 2012 | Completed final sign-off Oct 2013 | 534 09th Av | revised pa# 2011-0812-2340-framing plan for rear deckDetails
revised pa# 2011-0812-2340-framing plan for rear deck | |
| Jun 29, 2004 | Completed final sign-off Sep 2004 | 1260 Hampshire St | repair & replace flooring for existing 3 decks of above address stucco- tiles & morter & repair deckDetails
repair & replace flooring for existing 3 decks of above address stucco- tiles & morter & repair deck | $4,500 |