Back to bathroom remodel contractors
Martin Paul Duggan Contracting
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jan 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 74 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 32 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 406 30th St | interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof.Details
interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof. | $150,000 |
| Aug 15, 2024 | Completed final sign-off Dec 2024 | 982 Junipero Serra Bl | renovation of (e) 2nd fl bathroom & bedroom as drawn. remove (e) skylikght @ bathroom not visible from streetDetails
renovation of (e) 2nd fl bathroom & bedroom as drawn. remove (e) skylikght @ bathroom not visible from street | $25,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2024 | 138 Chenery St | renovation of kitchen & bathroom: new windows in south elevation & new doors on north elecation, existing windows & door on south elevation to be removed and walls, patched & sided to match existing.Details
renovation of kitchen & bathroom: new windows in south elevation & new doors on north elecation, existing windows & door on south elevation to be removed and walls, patched & sided to match existing. | $50,000 |
| Nov 21, 2022 | Completed final sign-off Jan 2024 | 624 Fillmore St | interior remodel kitchen and bathDetails
interior remodel kitchen and bath | $20,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2021 | 133 Steiner St | new floor finishes throughout. new base and trim throughout, new cabinetry troughout. new interior doors and hardwarde throughout. new paint. no work at kitchen and bathDetails
new floor finishes throughout. new base and trim throughout, new cabinetry troughout. new interior doors and hardwarde throughout. new paint. no work at kitchen and bath | $8,000 |
| Jun 15, 2018 | Completed final sign-off Feb 2019 | 504 Liberty St | unit 504b- remodel bath in kind, new finishes througout,Details
unit 504b- remodel bath in kind, new finishes througout, | $20,000 |
| Mar 27, 2017 | Completed final sign-off Mar 2019 | 706 11th Av | horizontally expand residence to the rear @ the ground flr 214 sq. ft for a (n) bdrm & full bathroom. an (e) hall in the garage will be conditioned. a (n) 125 sq. ft deck wil be added above the addition.Details
horizontally expand residence to the rear @ the ground flr 214 sq. ft for a (n) bdrm & full bathroom. an (e) hall in the garage will be conditioned. a (n) 125 sq. ft deck wil be added above the addition. | $45,000 |
| Oct 15, 2013 | Completed final sign-off Jan 2014 | 1267 17th Av | remodel kitchen & bathroom in kind. replace cabinets, counter, backsplash, paint.Details
remodel kitchen & bathroom in kind. replace cabinets, counter, backsplash, paint. | $10,000 |