Martin Masonry
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Oct 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2015 | Completed final sign-off Jan 2016 | 230 Tocoloma Av | replacement in-kind for exterior egress stairsDetails
replacement in-kind for exterior egress stairs | $10,000 |
| May 16, 2012 | Completed final sign-off Aug 2012 | 265 Tocoloma Av | take out tile stairs, replace dry rot studs & ramp. rebuild steps (front entry). see termite report lingruen report #58934Details
take out tile stairs, replace dry rot studs & ramp. rebuild steps (front entry). see termite report lingruen report #58934 | $7,500 |
| Jun 2, 2011 | Never finaled issued Jun 2011, no final | 1472 York St | repair stair case with brick and tile, no structural work to be done, replace in kind treads and risers onlyDetails
repair stair case with brick and tile, no structural work to be done, replace in kind treads and risers only | $9,000 |