Back to bathroom remodel contractors
Martin Hawkins
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Apr 2018
- Last 24 months
- 0 permits filed
51 permits since 2000: 35 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2017 | Completed final sign-off Feb 2018 | 2013 Buchanan St | remodel existing bathroom 1st floor all new. remodel existing bathroom 2nd floor all new. new sink and counter tops, 2nd floor kitchen, no structuralDetails
remodel existing bathroom 1st floor all new. remodel existing bathroom 2nd floor all new. new sink and counter tops, 2nd floor kitchen, no structural | $60,000 |
| Jun 6, 2017 | Completed final sign-off Oct 2019 | 64 Surrey St | excavate basement by 382 sf of living area & (1) bath. remodel kitchen on floor 1. create partial 2nd story by raising roof @ rear half of bldg. add bath @ floor 2. add exterior deck (40 sf) @ floor 2. build staircase from basement to floor 2.Details
excavate basement by 382 sf of living area & (1) bath. remodel kitchen on floor 1. create partial 2nd story by raising roof @ rear half of bldg. add bath @ floor 2. add exterior deck (40 sf) @ floor 2. build staircase from basement to floor 2. | $315,000 |
| Jul 18, 2016 | Completed final sign-off Mar 2017 | 680 Waller St | bathroom remodel, add new w/c shower and vanity to (e) location , no structural workDetails
bathroom remodel, add new w/c shower and vanity to (e) location , no structural work | $12,000 |
| Jul 7, 2016 | Completed final sign-off Jun 2017 | 867 Clayton St | bathroom, laundry room, renovations include fixtures, finishes, replace (2) lightwell windows (not visible from street) and water heater. convert laundry room into powder room, move laundry to kitchen; lightings in 2 bedrooms.Details
bathroom, laundry room, renovations include fixtures, finishes, replace (2) lightwell windows (not visible from street) and water heater. convert laundry room into powder room, move laundry to kitchen; lightings in 2 bedrooms. | $42,000 |
| Jul 30, 2014 | Completed final sign-off Sep 2014 | 64 Surrey St | remodel existing bathroom in same location no structural work, replace two windows & 1 door at rear of building at same opening no structural. u factor 0.32 max.Details
remodel existing bathroom in same location no structural work, replace two windows & 1 door at rear of building at same opening no structural. u factor 0.32 max. | $15,000 |
| Mar 18, 2013 | Completed final sign-off Jun 2013 | 745 El Camino Del Mar | remodel in extg residence in basement area. work to include adding a new full bath and enclosed laundry room in same location as extg laundry area. no change in bldg envelope or exterior.Details
remodel in extg residence in basement area. work to include adding a new full bath and enclosed laundry room in same location as extg laundry area. no change in bldg envelope or exterior. | $30,000 |
| Mar 1, 2013 | Completed final sign-off Jun 2013 | 745 El Camino Del Mar | remove existing bathroom on 2nd floor - all new fixtures, tiles and vanity. change tile @ existing half bathroom on 1st floor. no structuralDetails
remove existing bathroom on 2nd floor - all new fixtures, tiles and vanity. change tile @ existing half bathroom on 1st floor. no structural | $15,000 |
| Dec 30, 2011 | Never finaled issued Dec 2011, no final | 65 Hermann St | unit #10-remodel of (e) bathroom, approx 5'x7', no structural work. new tile backer board around tub & re-tile. re-tile floor/re-set toilet in same place, re-set vanity in same place & paintDetails
unit #10-remodel of (e) bathroom, approx 5'x7', no structural work. new tile backer board around tub & re-tile. re-tile floor/re-set toilet in same place, re-set vanity in same place & paint | $5,000 |
| Oct 5, 2011 | Completed final sign-off Feb 2012 | 890 De Haro St | addition of new bathroom at 1st floor, minor interior finish work in storage room. legalizeDetails
addition of new bathroom at 1st floor, minor interior finish work in storage room. legalize | $45,000 |
| Sep 13, 2011 | Completed final sign-off Jan 2012 | 11 Commonwealth Av | 2nd fl master bath interior work including demo of non structural walls as reqd for 18 sf bath expansion. demo finishes, remove e plumbing fxt, new finishes,fixutresDetails
2nd fl master bath interior work including demo of non structural walls as reqd for 18 sf bath expansion. demo finishes, remove e plumbing fxt, new finishes,fixutres | $15,944 |
| Jul 15, 2011 | Completed final sign-off Jan 2012 | 151 Burnside Av | add new bedroom and bath adjacent to existing garage on gr floor within existing footprint of residence, change window to sliding door, door to window at bathroom; demolishing existing door and adding a windowDetails
add new bedroom and bath adjacent to existing garage on gr floor within existing footprint of residence, change window to sliding door, door to window at bathroom; demolishing existing door and adding a window | $30,000 |
| Mar 2, 2011 | Completed final sign-off Jul 2011 | 1648 12th Av | remodel extg second floor kitchen and bathroom. enlarge opening between kitchen and family room and family room and living room.Details
remodel extg second floor kitchen and bathroom. enlarge opening between kitchen and family room and family room and living room. | $25,000 |
| Apr 5, 2010 | Completed final sign-off Jul 2010 | 1680 11th Av | remodel existing bathroom, remodel e bedroom to create additional 2nd bath and new closet configuration. add skylight at new bath.Details
remodel existing bathroom, remodel e bedroom to create additional 2nd bath and new closet configuration. add skylight at new bath. | $40,000 |
| Apr 21, 2009 | Expired or cancelled expired Jul 2010 | 1030 Chenery St | remodel extg bathroom. remove and replace bathroom wndw. add 3 new skylights with partial parapet wall at bathroom skylight.Details
remodel extg bathroom. remove and replace bathroom wndw. add 3 new skylights with partial parapet wall at bathroom skylight. | $9,500 |