Martin Bruch
- Based in
- Burlingame
- On San Francisco permits
- Mar 2005 to Jul 2010
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 41 days from filing to permit and 17 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2010 | Completed final sign-off Mar 2010 | 2927 Folsom St | repair stairs behind building, replace fence less than 6' high, replace porch on side (more than 50%). no change to existing landing.Details
repair stairs behind building, replace fence less than 6' high, replace porch on side (more than 50%). no change to existing landing. | $6,000 |
| Dec 15, 2006 | Completed final sign-off Feb 2007 | 4057 19th St | to comply with 3r-4616. replace misc. stair treads, add (2) stair stringers to existing, double sheetrock, (7) posts in garage, sheetrock small laundry wall.Details
to comply with 3r-4616. replace misc. stair treads, add (2) stair stringers to existing, double sheetrock, (7) posts in garage, sheetrock small laundry wall. | $1,200 |